Рет қаралды 45,142
Sharing my solution for lifting well pipe by hand, 1 man operation. Ideally a 3 man job: 1 at the well pipe setting knots, one on the roof winching and releasing the knot, and one on the ground moving the pipe across the ground. 1 man is a 10 hr job for 250 ft.