Railtrack - Repair of Wet Beds

  Рет қаралды 6,943

onhms

onhms

Күн бұрын

Пікірлер: 11
@colliecandle
@colliecandle 3 жыл бұрын
Nice to see the 'wet bed' problem filmed - memories of Amey Rail work back in that time when i was fitter and a lot younger !
@Richardsrailway
@Richardsrailway 10 ай бұрын
L&P and booked tamper on your section plus good ballast profile and condition shouldn’t give you a wet bed . As a former patrolman , we had a divvy manager who briefed the night gang about the electricity at work act 1974 , then asked me if when I was on days the following shift if I would take the lads out onto the down main fast during the peak and dig out a nasty wet bed that was right on the tip of the juice rail ramp end and was bubbling and fizzing away nicely , and would I do it without a form C isolation! ! ! I replied was he on drugs ? , give me the isolation and a possession and I’d do it was my reply . You couldn’t make it up . We had such a bad wet spot by the single line tunnel at Raynes park on the up , 15 beds worth of slurry broken keys , missing housings on some sleepers , it was a potential derailment, it was like that for over a year the section maintenance engineer was horrified whilst out on a walk with me , I used to keep a copy of all of my walk out patrol sheets in my locker in case the office denied it , I had reported it every week as did my mates in the gang , half a dozen tie bars were put on ASAP and two weeks later they re laid the track. Horror stories from a railwayman of twenty years I could tell .
@StuAnderson90
@StuAnderson90 Жыл бұрын
Repairing a wet bed.. mate i'd chuck it out order a new from from DFS.... and sack the person who wetted the bed 🤣🤣🤣
@Spookieham
@Spookieham 3 жыл бұрын
I see they are using the peewee safety monitor which was never brought into service.
@cjmillsnun
@cjmillsnun 3 жыл бұрын
PeeWee was and remains in service to this day. ILWS was never brought into service.
@ianryansmith
@ianryansmith Жыл бұрын
It's shocking to see that this is still the best practice method. The actual on track method is far and away from this.
@rogerphillips5193
@rogerphillips5193 Жыл бұрын
In order to complete the work the rail surface should be ground as many wet beds are caused by imperfections and irregularities on the rail surface This should then stop a reoccurance
@dieseldave3879
@dieseldave3879 2 жыл бұрын
👍
@christopherwaring8285
@christopherwaring8285 2 жыл бұрын
REPAIR WET BEDS SHOULD GO TO THE TOILET AT NIGHT
@K-M1
@K-M1 2 жыл бұрын
What a horrible job
@BT-kf4kx
@BT-kf4kx 3 жыл бұрын
why cant unsub irrelevant youtube videos, what does this even mean confusing people lol
Long Nails 💅🏻 #shorts
00:50
Mr DegrEE
Рет қаралды 16 МЛН
Players push long pins through a cardboard box attempting to pop the balloon!
00:31
🚂 Emergency Railway Track Repair ⛏️
6:12
tletter
Рет қаралды 54 М.
Replacing Tracks with Network Rail
10:30
Geoff Marshall
Рет қаралды 149 М.
The interesting engineering behind the SHAPE of Train wheels!
4:30
Sabins Civil Engineering
Рет қаралды 31 МЛН
Being a Railway Signaller - with Christopher Nairne
9:29
Chris Eyre Film
Рет қаралды 15 М.