No video

Restoring the River Leven: Phase Two (Summer 2024)

  Рет қаралды 631

Levenmouth Reconnected

Levenmouth Reconnected

Ай бұрын

A key phase of improvements to the River Leven flowing through the heart of Levenmouth is about to get under way.
Following successful work on the north shore of the river over the last year, the Restoring the River Leven Project’s Phase Two will now focus on the stretch between the Kirkland and Burn Mill Dams with modifications planned to make it easier for fish to migrate up and downstream.
The Leven Programme’s vision is to restore the river for the benefit of local people and wildlife, and one way to achieve this is to remove or adapt some of the man-made challenges that have impacted the way the river functions.
So, working closely with river restoration specialists cbec-eco-engineering, the local community, landowners and other key stakeholders, the Leven Programme devised a number of improvements to allow the river to work more naturally.
For Kirkland Dam, the proposal involves using rocks and boulders to create a rough surface on the face of the dam, sloping down to the natural riverbed below. This will remove the jump or step which is restricting the movement of fish and will provide areas of faster and slower flowing water to help the fish move up and down the structure more easily.
For Burn Mill Dam, which is already in a bad condition, the plan is to remove the structure completely.
Other improvements planned include: the creation of shallow ‘ponded’ areas to promote wetland and wet woodland habitat; the removal of rock and stone bank protection to be replaced with greener more sustainable alternatives; the planting of native trees and wetland plants along the riverbanks and floodplain areas; and the placement of large wood along and within the river to encourage natural processes and provide shelter for fish, birds and invertebrates.
Music: www.purple-planet.com.

Пікірлер
Natural Stream Restoration: Restoring Streams (Part III)
17:37
OkStateDASNR
Рет қаралды 184 М.
OPENING A SPILLWAY GATE AFTER YEARS OF BEING CLOSED
5:11
Kashmir Explorer
Рет қаралды 968 М.
Meet the one boy from the Ronaldo edit in India
00:30
Younes Zarou
Рет қаралды 18 МЛН
UNO!
00:18
БРУНО
Рет қаралды 5 МЛН
The Beltie Burn: A River Restored
7:37
SCOTLAND: The Big Picture
Рет қаралды 88 М.
Restoring the River Leven
5:44
Levenmouth Reconnected
Рет қаралды 7 М.
Biggest Megaprojects Under Construction in 2024
20:25
MegaBuilds
Рет қаралды 1,2 МЛН
The Crazy Engineering of Venice
9:28
Primal Space
Рет қаралды 3,5 МЛН
Dry Fly Fun   River Leven
16:05
Davie K Fly Fishing
Рет қаралды 896
The Hemlock Dam Removal Story - Columbia Basin Restoration
11:33
craglawcenter
Рет қаралды 441 М.
River Stiffkey Project
16:39
Aquamaintain Ltd
Рет қаралды 538
White River Restoration
11:05
riverbankmedia
Рет қаралды 29 М.
Restoring a River: Bringing back the Coonamessett
9:32
Alison Leschen
Рет қаралды 71 М.
Build mini hydropower on a small stream with a powerful unit
13:59
Construction General
Рет қаралды 36 МЛН