Рет қаралды 520
Hello everyone. Mini review. What is done in the apartment. The electrics are completely laid. I had to lay on the ceiling in a panel house. Since there are curved ceilings and it makes no sense to putty them, since they will crack. Then there will be tension. Therefore, the wiring is laid on the ceiling. Boxes. Everything is signed, under the numbers. Socket groups, lighting groups. All points are separated. Wires, weak points, twisted pair, TV cable are prepared. Everything is lying, the wires are out, the electric shield will hang here. Here the cross switches are assembled. The illumination of the floating bath, the bathroom area, the floating ceiling. The floating bath will be illuminated. Fan.
The walls are prepared for gluing, plastered, cleaned, even primed in the corridor. Tiles are laid in the hallway, in the kitchen, bathroom, toilet.
By the way, plumbing wiring has been done, a bypass has been soldered, a heated towel rail under the taps. Conclusions for boilers are made, everything is divorced, summed up, embedded in the wall. It goes neatly hidden, everything is hidden. Only here are the sockets, kan