This is the kind of post I look forward to watching more than once because of Tim narrating so much interesting detail along the way. Discovering this channel and a couple of aviation channels I subscribe to has made my hobby-interests-life more interesting and educational but less productive in keeping-up with the honey-do list LOL. At age 76, so be it.
@contender357 Жыл бұрын
I enjoy watching your videos, especially the northeast corridor and the Raritan valley line. You certainly know your CNJ history very well. They had some of the most beautiful stations. My father worked for the CNJ and on the day before the Aldene plan took effect we took the train to Jersey City to ride the ferry one last time. Keep up the good work!
@scottyerkes18672 жыл бұрын
Interesting ride. I've visited friends who used to live in High Bridge. Traveled there by car. Thanks Tim😀💚
@dougow3061 Жыл бұрын
great video love the information you give!
@de-fault_de-fault2 жыл бұрын
Netherwood is also in Plainfield, so 2 out of 4 Plainfield stations are still in use. Right before the old Queen tower (or right after it going the other way) you cross over Richmond Street. That's the street I grew up on. Edit: The old armory was just east of Netherwood, one block south of the tracks at Leland Avenue and 7th Street. It's a charter school now.
@deepnation100092 жыл бұрын
You beat me to it. Yep, Netherwood is in Plainfield.
@295g2952 жыл бұрын
> 45:30
@jamallhayden25122 жыл бұрын
Thanks for the video!
@loocpoc2 жыл бұрын
I will be happy to see them bring back service via the old Reading Railroad to West Trenton and hopefully bring back service to Easton and Philipsburg
@philliplee9802 жыл бұрын
Very cool I used to work at that raritan yard
@davidvilabrera2 жыл бұрын
I have to see the rest of the line from Raritan to Highbridge - on another video there was an old F-7 locomotive stored on a siding somewhere past Raritan - don't know if it is still there.
@3985uprr2 жыл бұрын
I filmed ride back from High Bridge to Raritan as a substitute.
@davidvilabrera2 жыл бұрын
@@3985uprr I will look into that one - thanks ! Correction- the locomotive was an F-3 ( I saw the chicken wire grills on the sides )
@steve-o9812 жыл бұрын
Do you know when that new span of the Portal Draw Bridge is due to be completed? I think that bridge is what members of Congress even from Colorado are referring to when they mention the disaster for rail commerce/passenger service that would occur if it became stuck/inoperable.
@deepnation100092 жыл бұрын
I believe one of the tracks will open by 2025 and then full open in 2026.
@prsl2472 Жыл бұрын
'Did a round-trip on the Philipsburg to Newark trains. You can blame my fellow Pennsylvanians at least partially for the route truncation. The last stop for the trains was Philipsburg (without a platform). However, the trains tied up at Allentown yard. NJ transit needed an "avoidable costs" subsidy to legally stop at Easton, Bethlehem, and Allentown. It amounted to what a used car might cost today. Neither LANTA (Lehigh and Northampton Transportation Authority), nor PENNDOT was interested in providing this subsidy. The political winds had changed. Service from the Lehigh Valley and Newark to Philadelphia also stopped. SEPTA hadn't added ventilation to the new Center City Commuter tunnel; and they also refused permission for NJ Transit to run above ground from West Trenton to 30th Street.
@295g2952 жыл бұрын
35:12 - While riding on the NEC line, I sit on the upper-level of these cars, and watch the centenary.
@TriStateRailfannerJL99963 Жыл бұрын
**UPDATE Y’ALL** Tomorrow 4/4/23, I will be taking this train (That is of course RARV Train 5175) in its entirety from PSNY to High Bridge. I do have a “scheduled” Virtual 5K and I wanted to find some awesome scenery for it. High Bridge, although very hilly, is indeed a very scenic area to compete virtually at. This 5K race is for an event happening Saturday, April 29, in-person in Milford, Michigan. This event is called “Prove It 10K & 5K,” and it will be held at General Motors Proving Ground in Milford. I compete ahead of the in-person participants due to other stuff in my schedule for that weekend. I signed up for the virtual Double, where I compete virtually in both the 5K and 10K. The 10K will be done at “home” in my university 2 weeks after tomorrow so no need to worry about mass transit conditions.
@laurelcreek72 жыл бұрын
My understanding was that gauntlet tracks were provided so that brakemen hanging off the sides of freight cars wouldn’t lose a couple of toes to station platforms.
@295g2952 жыл бұрын
1:08 - This is running with a dual-power locomotive? ( pantograph electric and diesel )
@TriStateRailfannerJL999632 жыл бұрын
It's hard to find direct service from High Bridge to New York Penn after midday. If you miss Train 5746, it's over for you; maybe you'll need to find an Uber or something along those lines
@de-fault_de-fault2 жыл бұрын
The line west of Raritan is single tracked, so during PM rush and late evenings they only run outbound trains to High Bridge. They can’t store them at High Bridge though so I guess they deadhead them back to Raritan so they can get out of the single tracked part sooner. I’ve never actually ridden all the way out there so I’m not sure.
@TriStateRailfannerJL999632 жыл бұрын
@@de-fault_de-fault Nor have I rode it once yet. But I may use it at some point for a round trip to compete in a Michigan-based virtual 10K, but not positive yet
@295g2952 жыл бұрын
15:45 - Did Lehigh Valley never have a terminal to New York City?
@3985uprr2 жыл бұрын
No they didn’t
@295g2952 жыл бұрын
11:31 - Red Bull Arena, MLS soccer stadium
@295g2952 жыл бұрын
57:30 I-287 is over
@DynamicDuo7953 ай бұрын
Bound Brook, sadly, is now strictly off limits to rail enthusiasts. The local crowd there ruined it for everyone. My friend confirmed this with me.
@philzablocki79092 жыл бұрын
Conrail reroutes through the Cranford and Westfield stations? No issues with clearance there being they don’t have gauntlet tracks?
@3985uprr2 жыл бұрын
Maybe not. I know they do that from time to time.
@philzablocki79092 жыл бұрын
I took a peek at the union and roselle park stations via google maps. When I zoomed in, both tracks at union have gauntlets but at roselle park only the eastbound track does. Interesting…
@3985uprr2 жыл бұрын
@@philzablocki7909 I’ve seen freights on that westbound track there
@apr859 Жыл бұрын
@philzablocki7909 from what i understand they are there in the event a conducter is riding the cars. They are heavily speed restricted to my knowledge
@ericschmidt73592 жыл бұрын
Finderne - Manville served the johns Manville asbestos plant
@Robbi4962 жыл бұрын
Any plans to run trains west of High Bridge again?
@3985uprr2 жыл бұрын
Maybe go back to phillipsburg
@TriStateRailfannerJL99963 Жыл бұрын
@@3985uprr They never or barely came to fruition 😔 I feel like there’s insufficient demand for service west of High Bridge, which impedes any progress
@jimstraveladventures39612 жыл бұрын
What is the Date??? 1/5/22 ???
@3985uprr2 жыл бұрын
It’s too early in the year for me to easily say 2023.