Rotherham Canal barrier low carbon concrete pour

  Рет қаралды 291

Jackson Civils

Jackson Civils

Күн бұрын

Jackson Civil Engineering is using ultra low-carbon concrete during the construction of a multimillion pound canal barrier at Forge Island in the centre of Rotherham.
The works, on behalf of Rotherham Borough Council, form the central part of the Rotherham to Kilnhurst Flood Alleviation Scheme that the Council is already delivering along 5km of the River Don.
The ultra low-carbon concrete is being provided by Jackson’s supply chain partner Breedon Concrete and will be used on non-structural areas of the build, such as for abutment supports and extensions to the tow path. A total of 180m³ ultra low-carbon concrete will be used, bringing up to a 70% reduction in embedded carbon compared with traditional concrete.

Пікірлер
How French Drains Work
16:41
Practical Engineering
Рет қаралды 2,8 МЛН
哈莉奎因被吓到了#Cosplay
00:20
佐助与鸣人
Рет қаралды 32 МЛН
Who is that baby | CHANG DORY | ometv
00:24
Chang Dory
Рет қаралды 35 МЛН
If Your Hair is Super Long
00:53
im_siowei
Рет қаралды 30 МЛН
Building a flood wall in Bewdley
1:28
Jackson Civils
Рет қаралды 322
What’s the Deal with Base Plates?
13:31
Practical Engineering
Рет қаралды 2 МЛН
How Japan Made Their Outlet Safe
12:32
Andrew Lam
Рет қаралды 866 М.
Inside the V3 Nazi Super Gun
19:52
Blue Paw Print
Рет қаралды 3,3 МЛН
Elon Musk spectacularly confirms Department of Education no longer exists
6:23
Sky News Australia
Рет қаралды 2,2 МЛН
How does an Electric Motor work?  (DC Motor)
10:03
Jared Owen
Рет қаралды 20 МЛН
Ickles Lock official opening
1:33
Jackson Civils
Рет қаралды 130
The Hidden Engineering of Landfills
17:04
Practical Engineering
Рет қаралды 8 МЛН
哈莉奎因被吓到了#Cosplay
00:20
佐助与鸣人
Рет қаралды 32 МЛН