Рет қаралды 151
2024.05.22 - We started our activities early part of April 2024. Understanding that the El Nino will linger a little while we decided to drill borewell in preparation for cultivating a 5 hectare land. We ran into several technical challenges with respect to power and malfunctioning Franklin Gould submersible. The solar pump was also a challenge in that I wasn't able to budget solar panels and so I ran drop wire that is 250 metre from my cousin's electric metre. That one ran into cable voltage drops droop. Those technical challenges gave me fun a minute of intense hail pulling moments, there were several of those.. Sigh.. It's more fun in The Philippines
The many challenges from lack of rain gave us feeling helpless, we will continue to persevere come what may
Narratives..