Saturation works for maintenance operations in TBM - Hong Kong

  Рет қаралды 10,169

HYDROKARST Group

HYDROKARST Group

Күн бұрын

Hydrokarst trained 50 hyperbarist technicians to live and work in saturation for maintenance operations in the TBM cutter head Tuen Mun - Chek Lap Kok in Hong Kong for Dragages Hong Kong and Bouygues TP. This 6.5 km long tunnel aims to connect Lantau island and the international airport.
LIVING AND WORKING IN SATURATION:
Technicians live in confined spaces, in the hyperbaric chambers and are transferred under pressure with hyperbaric shuttles up to the TBM cutter head.
They reach the pressurized area where they change cutting wheels, provide general maintenance and evaluate ground cohesion.
They return to pressurized habitat where they sleep, feed and live for 28 days.
Decompression, process of safe return to the surface, occurs at the end of their stay and lasts about 3.5 days.
TECHNICAL MEANS:
Intervention depths between 35 and 65 meters imposed the use of respiratory gases based on oxygen, nitrogen and helium specially calculated for this project because pressurized air is toxic at these pressures.
Base camp, transfer shuttles have been specially designed and built for this operation of more than 18 months and a total of 2 456 man-days of saturation.
TIME LINE:
Project explanation: 00:23
Hydrokarst presentation: 01:42
Tunnelling boring machine: 02:40
Intervention in compress air area technique: 03:10
Saturation diving technique: 04:50
Saturation chambers: 06:55
Saturation procedures: 07:50
Chamber transfer in the TBM cutter head: 09:53
Technician in the cutter head: 11:00
Personnel: 11:16
LINK:
If you are interested about saturation diving techniques, check out:
Our video: Insulation of bottom outlet and water intake - Punt Dal Gall Dam: • Insulation of bottom o...
Our reference: Punt Dal Gall project : www.hydrokarst...
Our last publication for Hydro 2018 conference in Poland about benefits of saturation diving for bottom outlet rehabilitation: www.hydrokarst...
FOR MORE INFORMATION:
www.hydrokarst...

Пікірлер
The Insane Scale of Europe’s New Mega-Tunnel
27:51
The B1M
Рет қаралды 14 МЛН
Chain Game Strong ⛓️
00:21
Anwar Jibawi
Рет қаралды 41 МЛН
99.9% IMPOSSIBLE
00:24
STORROR
Рет қаралды 31 МЛН
СИНИЙ ИНЕЙ УЖЕ ВЫШЕЛ!❄️
01:01
DO$HIK
Рет қаралды 3,3 МЛН
人是不能做到吗?#火影忍者 #家人  #佐助
00:20
火影忍者一家
Рет қаралды 20 МЛН
How to Make a Real Diamond - (Not Clickbait)
8:51
JerryRigEverything
Рет қаралды 5 МЛН
Insulation of bottom outlet and water intake - Punt Dal Gall Dam
11:25
HYDROKARST Group
Рет қаралды 18 М.
How does the Crew Dragon Spacecraft work? (SpaceX)
19:26
Jared Owen
Рет қаралды 5 МЛН
The Insane Engineering of MRI Machines
17:53
Real Engineering
Рет қаралды 3,2 МЛН
MEGA TUNNEL MACHINES - Drilling, Digging & Blasting | Full Documentary
48:48
WELT Documentary
Рет қаралды 1,7 МЛН
How does an Elevator work?
11:33
Jared Owen
Рет қаралды 5 МЛН
Large Diameter EPB Shield
13:08
Herrenknecht AG
Рет қаралды 113 М.
Plongée à saturation par HYDROKARST sur le barrage de TOLLA en Corse
12:48
Mixshield
11:21
Herrenknecht AG
Рет қаралды 36 М.
How does the Soyuz Launch work? (and Reentry)
16:10
Jared Owen
Рет қаралды 6 МЛН
НЕ ДАМ ЕЁ В ОБИДУ😡 #shorts
0:24
Паша Осадчий
Рет қаралды 1,6 МЛН
КАК ЖИВЕТ КВАНТУМ? РУМ ТУР КВАНТУМА!!!
13:51
СИЖУ БЕЗ ЕДЫ, ПЬЮ ОДНУ ВОДИЧКУ.
21:37
Быть Добру
Рет қаралды 79 М.
Down Spout Catch Basin Installation to French Drain
0:58
Komar Project
Рет қаралды 6 МЛН