Рет қаралды 2,939
Route 11 trolley was delayed due to CSX freight crossing 6th & Main Streets in Darby. I stopped recording because the train had stopped in the middle of the diamond crossing. The trolley tried to beat the train, but was forced to stop and had to reverse. Trolley pole came off the underside of the wire, but it was able to back up before CSX came through