Рет қаралды 947
The UVP125 packer is made for rapid renovation of longitudinal and radial cracks from inside pipes made of concrete, steel, reinforced concrete, fibre cement, cast iron or PVC by installing a 600mm (24") long UV-cured resin pre-impregnated fibreglass patch. Longer damages can be rehabilitated by overlapping patches.
The wide-spectrum, Ultra Violet, LED light-train has a low power consumption and is suitable for pipes of differing diameters from 150 to 400mm (6-16”) by adjusting the end-discs and bladders of the packer.
Easily driven in place with the R125 crawler
The UVP125 can be used as a stand-alone packer, or as a job-specific module on the R125 crawler for fast traversing through the pipe and precise positioning of the packer.
Pre-impregnated fibreglass liner on a roll
UV-cured FIBALITE fiberglass-reinforced patches are pre-impregnated with high stiffness, non silicate, resin and supplied with protection films on a convenient roll. One roll of this liner material is suitable for all diameters and eliminates time-consuming mixing of resins and impregnating of the carrier materials on site. Ensuring a clean and hassle-free installation with a 3 minute preparation time and 8 minutes curing time.
Pan & tilt camera
The front-placed Pan & Tilt CCTV camera provides excellent vision to overview the installation process and to post inspect the freshly rehabilitated pipe immediately after the patching is completed.
Installation
The installation of UV cured patches was never this fast and clean:
1. Cut to size
2. Remove inner protection film at overlap
3. Remove outer protection film
4. Secure for transport
5. Position the packer
6. Inflate packer
7. Cure for 8 minutes
8. Deflate packer
9. CCTV post-inspect
Have a look at www.sewerrobot... or contact info@sewerrobotics.com to receive more information or to schedule a live demonstration.