Very informative and well done video explaining this very challenging area of electrical engineering and design. I will study this in depth and like others have said, the excel calculation sheet would be a very handy tool if you would be willing to share. My question to you is what are the electrical hazards that exist if the underground cables need to be excavated, by hand digging, to correct a problem of cable pulling out of the link box? The supports were insufficient in the original design so the intent of the company is to keep the substation energized, excavate the entire area under the elevated substation, expose all of the energized 110kV single core cables and attempt to secure them correctly this time. The cable run is relatively short,
@TheMateusCirolini Жыл бұрын
Thank you for sharing thi. Keep posting!!
@gyanguru-pathtoexcellence Жыл бұрын
Thanks for Watching and appreciating the effort
@baljitchopra60547 ай бұрын
Excellent presentation technique. You should make more of such videos on topics related to Electrical Power Distribution System. Indians excel in teaching all over the World and your contribution is very much appreciated.
@gyanguru-pathtoexcellence6 ай бұрын
Hello, Thank you for your suggestion. We appreciate your input and will take it into consideration. Best regards,
@rasoulmehrara936310 ай бұрын
Thank you so much for your brief and accurate explanations. How can I have an access to your excel file?
@murisbasagic43466 ай бұрын
Excellent video. Can you send me excel file. I need to determine one SVL? Is this for one minor section cable or for the hole length of cable? How did you calculate row 14(Induced voltage for a full load current)? Thanks in advance