Siemens TIA Portal & Factory IO (Off Delay TOF Timer)

  Рет қаралды 18,178

Pete Vree

Pete Vree

Күн бұрын

Пікірлер: 22
@PeteVree
@PeteVree Жыл бұрын
Here is a link to purchase Factory IO. (Note: this is an affiliate link for my channel) factoryio.com/url-action?ref=petervree Full Siemens TIA Portal PLC Programming Course available here: petevree.thinkific.com/courses/siemens-tia-portal-plc-programming Playlist Link for further videos: kzbin.info/aero/PLyL0ResmI4Q2Rz5wtTKWhKhFMLnWU1n6Q
@kend609
@kend609 5 жыл бұрын
2:00 the timer is orange because is an Int, you need to map it to a int memory location in the plc. open configuration and click in default and factoryIO will remap the address and you'll see the other connection slots that have an int as input.
@frankreiserm.s.8039
@frankreiserm.s.8039 3 жыл бұрын
It is interesting that a reverbicating pump which are common for these types of tanks cannot be controlled by integrative formulations related to phi. Phi varies depending on the integration of the fill rate, where phi = ln (1 + fill rate)/quescent flow rate eta.
@framos9991
@framos9991 Жыл бұрын
Thank you! its interesting//
@RealgamesPt
@RealgamesPt 7 жыл бұрын
About the Timer tag: you can set the number and type of inputs/outputs on the Driver Configuration page. Click on CONFIGURATION and then set the Count of DWORD Outputs to 1. Now you should see a new output (QD100) which you can use to map the Timer tag. More info here: factoryio.com/docs/manual/drivers/s7-1200-1500/ Nice videos BTW!
@PeteVree
@PeteVree 7 жыл бұрын
Awesome. Thanks so much for creating such a great software!
@TheGazanews
@TheGazanews 7 жыл бұрын
great tutorial thank you. already subscribed and activated the notifications ;)
@aniket7201
@aniket7201 5 жыл бұрын
Sir make more vids regarding different instructions used on this plc just like that AND/OR logic videos :)
@nabilmarsel8792
@nabilmarsel8792 3 жыл бұрын
Hello, I'm beginner with this Automation Field, so I want to ask you about that function block, they always called it ''MHJ-PLC-LAb...'' what is using for and what there is inside it. if you can help me I would be so thankful.
@autome4374
@autome4374 4 жыл бұрын
hi sir am using step-7 with plcsim not TIA portal i noticed that the TOF timer is incrimental in TIA portal but in step-7 id decrimental
@huntingexperiences93
@huntingexperiences93 6 жыл бұрын
Hi :) can i have a question? For example in time 9:20 button I0.1 is not pressed and in TIA its set on normally closed contact so why it is not active?
@PeteVree
@PeteVree 6 жыл бұрын
I had to use the opposite logic for I0.1 Drain PB, it is a NC contact, so I am using the NC instruction (or the Examine if Open) Instruction. This instruction waits for a zero, or no voltage present.... so once I press the Drain PB, it stops the voltage from being impressed on that physical contact and starts the TOF timer. I need to provide the TOF timer with a momentary signal in order for it to start timing out. Hope this clears things up.
@huntingexperiences93
@huntingexperiences93 6 жыл бұрын
Pete Vree my English is not so good but I think that I understand. Just one more time. If we have normal contact and we press button then output is 1. But if we have NC contact then if we aren’t press button then output is 1. But in time 9:20 there is NC contact , stop button is not pressed and I thought that it means that contact is active. But it’s not active.
@PeteVree
@PeteVree 6 жыл бұрын
The Normally Closed Instruction looks for the presence of a Zero. The Normally Open Instruction looks for the presence of a 1. The PLC instructions are the opposite of the way the physical normally open, normally closed contacts are in reality. The I.01 is not pressed, so it is still providing voltage to the input, or a 1 in the memory. I.01 is a normally closed instruction in the plc, so it is waiting for a Zero.... this will only happen when I press the PB, stopping voltage to the input, and allowing the logic prior to the TOF timer to be true.
@PeteVree
@PeteVree 6 жыл бұрын
Perhaps this video will help... kzbin.info/www/bejne/a56wpauDqtGFgrM
@huntingexperiences93
@huntingexperiences93 6 жыл бұрын
Pete Vree Ok last questions. 1) NO or NC contact is feature Physical plc or its just our choice in program ? 2) NO provide 1 after I pressed button. Bcs after that there is 24 volts. 3) NC provide 1 when I didn’t press button. 4) Sooo in a video. The STOP button is like NC and it’s not pressed so I expected that it will be active but it’s not. It’s became active after u press button
@sanketamesar4753
@sanketamesar4753 4 жыл бұрын
Which software is used as factory IO Please send me the link
@PeteVree
@PeteVree 4 жыл бұрын
just google Factory IO.... factoryio.com/
@The_Daya
@The_Daya 6 жыл бұрын
If it is possible please send me a PDF copy of logic
@PeteVree
@PeteVree 6 жыл бұрын
I did this video a while back and don't have a copy in pdf. Perhaps you can just take a screenshot.
Siemens TIA Portal Tutorial (CTU Counter)
8:18
Pete Vree
Рет қаралды 82 М.
amazing#devil #lilith #funny #shorts
00:15
Devil Lilith
Рет қаралды 18 МЛН
Trapped by the Machine, Saved by Kind Strangers! #shorts
00:21
Fabiosa Best Lifehacks
Рет қаралды 35 МЛН
Car Bubble vs Lamborghini
00:33
Stokes Twins
Рет қаралды 37 МЛН
Siemens TIA Portal & Factory IO (On Delay TON Timer)
21:34
Pete Vree
Рет қаралды 21 М.
Siemens TIA Portal & Factory IO (Timer Tutorial)
34:48
Pete Vree
Рет қаралды 22 М.
Siemens TIA Portal & Factory IO (2 Wire Control of Conveyor)
26:35
Factory IO Tutorial (How to set up Siemens S7 1200 Drivers)
31:18
Siemens TIA Portal & Factory IO (3 Wire Control of Conveyor)
14:09
USO DE TIMER EN FACTORY IO
14:41
Fabian Camacho Severino
Рет қаралды 1,8 М.