Great video - just for info the Kia EV's offer vehicle to load, although I've never tried this with my EV6.
@Cagsjdr57 күн бұрын
I’ve heard really good things about them. Edit… oh bollox… those bolts!
@ricksproxton96957 күн бұрын
If you go into settings and tools, then app settings, then notifications, you can select Go-off Grid as an alert
@joondalupelectricalservice32016 күн бұрын
Perfect thank you, I believe that may have just been added to the App.
@Nerdificationing3 күн бұрын
I have a 3 phase string inverter with 8kw of panels and a second 6kw system with Enphase iQ7As. Can I get a Sigenergy battery without decommissioning my existing inverters
@Georgemax110 күн бұрын
A good very in-depth look. I disagree though the sungrow Sh15t(20,25) model inverters are three phase and do have UPS switchover of a slower 10 ms.
@joondalupelectricalservice320110 күн бұрын
thank you I dont believe the Sungrow has the same capacity when islanding but I will check thank you
@sb4photos8 күн бұрын
Hi. What’s the largest single phase inverter they have currently?
@joondalupelectricalservice32018 күн бұрын
Hi 12kw single phase.
@sb4photos6 күн бұрын
@@joondalupelectricalservice3201are the 8 and 10 kw inverters able to be installed in qld?
@John-B9110 күн бұрын
Great video, very informative. I am looking at getting a single phase home battery system, tossing up between the new Powerwall 3 batteries and the Sigenergy system. What was the capacity of the inverter you installed? Must have been one of the larger units to handle so many panels. I think that system you installed with almost 20kW of solar will still have a lot of power exported with the 8kWh battery or even up to 24kWh. In NSW we are limited to just a 5kW inverter on single phase.
@joondalupelectricalservice320110 күн бұрын
Thank you. That one is 15kw three phase. Export limited to 1.5kw. If you are single phase and have an existing solar system I would go Powerwall2 still.