Stockton Blvd/34th St. Railroad Crossing With Bollard Protection Finished| SACRT, Sacramento CA

  Рет қаралды 1,174

MobileRailSpotterRxR

MobileRailSpotterRxR

Күн бұрын

Пікірлер: 9
@ChaoticBeanTheBean
@ChaoticBeanTheBean 13 сағат бұрын
Great catch, and its also great that they finally built protection for that cantilever.
@RandomRailfan828
@RandomRailfan828 13 сағат бұрын
Nice catches man, glad they added some protection!
@benwalters2449
@benwalters2449 11 сағат бұрын
I like how it’s described as “new” bollard but already has the paint scuffed 😂😂😂
@MobileRailSpotterRxR
@MobileRailSpotterRxR 10 сағат бұрын
Yeah trucks and cars wont listen to the signs here and keep taking a right turn they can't make and is a illegal right turn. The bollard was first hit a day after being installed and a few more times after that.
@JMANWiSS
@JMANWiSS 8 сағат бұрын
Is the way that truck is turning at 2:30 the intended route right turning traffic is supposed to take? What is the signage like for that routing?
@MobileRailSpotterRxR
@MobileRailSpotterRxR 6 сағат бұрын
Yes. There are signs on 34th St approaching this intersection that say to take R St as the right turn to Stockton Blvd and then there are signs at the crossing saying no right turn from 34th to Stockton. Back in early 2024, they converted R St right there from a two way to a one way so that trucks can turn there but at the same time didn't widen it for trucks. At 3:00, another truck used that path and could barely fit as many also due to the damaged curb. The City of Sacramento and SACRT both like to take the cheap alternative with everything and then wonder why it doesn't work out as intended.
@speedemon3364
@speedemon3364 5 сағат бұрын
Okay! Looks like they finally decided to do something about the intersection! Though, it looks kinda small there, and I feel like a truck could easily destroy that and still hit the cantilever, if the truck is big enough. Yeah, they should have fixed the turn at R Street to make it wider... there is enough room there, and the sidewalk could be widened or moved back also. I am disappointed though, as this means that SACRT will never ever change the bell sequence back or replace the US&S E-Bell...
@Mexicalifornia82
@Mexicalifornia82 9 сағат бұрын
I'll be 😂😂😂 if those protections fail. Maybe they need to bring back the incandescent traffic signal light. That will solve the problem with all of those LED lights.
@MobileRailSpotterRxR
@MobileRailSpotterRxR 6 сағат бұрын
The last time the temporary traffic light was here, it had its incandescents replaced.
Chain Game Strong ⛓️
00:21
Anwar Jibawi
Рет қаралды 41 МЛН
Sigma Kid Mistake #funny #sigma
00:17
CRAZY GREAPA
Рет қаралды 30 МЛН
Гениальное изобретение из обычного стаканчика!
00:31
Лютая физика | Олимпиадная физика
Рет қаралды 4,8 МЛН
Storm Damaged Railroad Crossings In Sacramento County Feb 4th & 5th, 2024
10:23
Trump Started Negotiations / Is the War Ending?
12:18
NEXTA Live
Рет қаралды 656 М.
TRAINS, SUBWAY, RAILWAY | Learn Transport in English | Tram, Subway Train, Steam, Bullet train
13:51
No Gate Arm Railroad Crossings Compilation, USA Railroad Crossings [4K UHD]
17:15
Chain Game Strong ⛓️
00:21
Anwar Jibawi
Рет қаралды 41 МЛН