STRESSING, LAUNCHING ERECTION AND GROUTING PCI - GIRDER LAMNYONG BRIDGE L = 25.80 METER, BANDA ACEH.

  Рет қаралды 538,369

Azzumar Utami

Azzumar Utami

Күн бұрын

STRESSING PCI - GIRDER TYPE I LAMNYONG BRIDGE L = 310 METER, BANDA ACEH.
Video ini menjelaskan tahapan langkah - langkah dari cara kerja pemasangan girder hingga tahapan akhir. diantaranya.
1. mememindahkan kelokasi kerja
2. menyusun
3. memberi gaya (jacking Force)
STRESSING PCI - GIRDER TYPE I LAMNYONG BRIDGE L = 310 METER, BANDA ACEH.
4. pengangkatan (rection)
5. dan gruting
STRESSING PCI - GIRDER TYPE I LAMNYONG BRIDGE L = 310 METER, BANDA ACEH.

Пікірлер
Post Tensioning and Grouting full stepwise video
10:02
Ambarish Bhope
Рет қаралды 291 М.
Сестра обхитрила!
00:17
Victoria Portfolio
Рет қаралды 958 М.
Quando eu quero Sushi (sem desperdiçar) 🍣
00:26
Los Wagners
Рет қаралды 15 МЛН
VIP ACCESS
00:47
Natan por Aí
Рет қаралды 30 МЛН
It’s all not real
00:15
V.A. show / Магика
Рет қаралды 20 МЛН
Process of Making Bridge Girders using Rebars. Precast Concrete Factory in Korea.
13:46
미스터 프로세스 Mr.Process
Рет қаралды 2,2 МЛН
Pertama Kali Di Indonesia Erection Steel Box Girder 241 Ton Metode Cantilever
9:59
Waskita Jembatan Kramasan
Рет қаралды 68 М.
What’s the Deal with Base Plates?
13:31
Practical Engineering
Рет қаралды 1,9 МЛН
ขั้นตอนการก่อสร้างสะพานยกระดับ Motorway M6 Sec 28 BigBlue R2
12:18
อัครเดช ศิริพันธุ์
Рет қаралды 2 МЛН
Jembatan proses Portal, I Girder stressing 2,
3:30
A Hakim
Рет қаралды 2,2 М.
Process of making ultra-high-strength concrete pile. Korean No.1 PHC pile factory
11:21
메가프로세스 Mega Process
Рет қаралды 3,9 МЛН
Сестра обхитрила!
00:17
Victoria Portfolio
Рет қаралды 958 М.