Switching Operations 101, Episode 2: Switching A Bakery

  Рет қаралды 8,692

Lance Mindheim's Railroad Channel

Lance Mindheim's Railroad Channel

Күн бұрын

Пікірлер
@evanschaefer3812
@evanschaefer3812 6 ай бұрын
Glad you started making videos on KZbin, Lance; looking forward to more!
@ThomasKlimoski
@ThomasKlimoski 5 ай бұрын
Lance, I enjoyed the video and ops on your layout. The video shows how much time it takes to "just" switch out two cars. I know you were filming so it is hard to do everything, but using the bell and horn as you cross back and forth across the grade crossing adds additional realistic steps for the crew.
@gdog5032
@gdog5032 5 ай бұрын
Thanks for these 'switching' episodes, Lance. I am in the process of building a layout based on your reference books 📚 and other Downtown information available.. 😊
@kurtcortes3738
@kurtcortes3738 3 ай бұрын
Wonderful Lance! My good friend Tom Johnson taught me all these operating practices before and I glad to see them in action in your layout!
@centralfloridarailroadmodelers
@centralfloridarailroadmodelers 5 ай бұрын
Great video! It's nice to see we're not the only ones that have little hiccups while filming!
@PrinceStreet
@PrinceStreet 6 ай бұрын
Earlier than 6:16 you mentioned the sound is pumped through computer speakers. I recall you mentioning that on your blog. What hadn’t resonated with me at the time would be how this would work in N scale: I could have a decoder in my engine selected only for its motor control and the engine was always silent. This decoder is only for motor control so this helps with the models (think RS1 or like smaller diesels) where speaker room doesn’t exist or frame modifications aren’t attractive. Then this second sound decoder leashed to the computer speakers can be any physical size. Finally, this offsets cost if the off-layout decoder is one like Soundtraxx’s that allows for easy changing of prime movers or similar attributes. I only need one of these decoders. The decoder in the model is motor control only so is easier to install, costs less. The quality of experience is potentially better and the investment is lower. You said this and I feel like I finally get it. -Chris
@Gaz3801
@Gaz3801 6 ай бұрын
Excellent video Lance. Watching this switching session and then listening to you on Around the Layout is thoroughly enjoyable. Thank you for taking your time to film Episode 2. Cheers, Gary.
@GCRR_Modeler
@GCRR_Modeler 6 ай бұрын
this was great - very enjoyable watching a "basic" operation of swapping out two cars. A lot of what Tom Klimoski has tried to teach me about switching ops is reflected in how you operate as well. For someone like me who is new to the hobby and who enjoys switching operations - this is gold. Thanks for taking the time and effort to share.
@shadowfaxx5
@shadowfaxx5 6 ай бұрын
Thanks for sharing! A few of us are starting a little operating group and this helps make sense of it!!
@mkivpanzer
@mkivpanzer 6 ай бұрын
Great video. Could you do a layout tour, and I hope for more switching ops. Really enjoy your books too!
@a.c.2219
@a.c.2219 6 ай бұрын
I remember I discovered your channel through your blog when I was still living my parents' circa 2013. Big inspiration. Glad I stayed subscribed because now it's paying off!
@19scamps92
@19scamps92 5 ай бұрын
Lance thank you so much for this great video series. Some of my friend and i are watching each one several times. our modules are largely influenced by your books, videos and your concept. Thank you for sharing your work and OPS with us. kind regards from Switzerland Robin
@thebritishrailroader
@thebritishrailroader 6 ай бұрын
Excellent video that really underpins and demonstrates the principles you set out in your book on operations.
@unpasaro
@unpasaro 4 ай бұрын
Excellent work Lance, I really enjoy and stop with your videos
@RailfanDownunder
@RailfanDownunder 5 ай бұрын
Superb ... I have fond memories of your old Monon layout too😊
@jstockton303
@jstockton303 6 ай бұрын
Very informative video, I like the level of detail. Could you do a video on the external sound system.
@claytonmoore2091
@claytonmoore2091 5 ай бұрын
I liked the real world timing !
@chrisbarr1359
@chrisbarr1359 6 ай бұрын
Great video. I learned a lot. I'm going to look for your book that someone mentioned. Take care!
@tomoconnell4235
@tomoconnell4235 5 ай бұрын
Thanks for another informative video
@SPOldMain
@SPOldMain 6 ай бұрын
Howdy Lance, great video, good to see these videos you are doing. Don’t know if you remember me or not, use to post on Trainirders as FJC, here on YT was FJ Caron. This is my YT page for the layout I finally have in the works, will be sharing progress videos as I go. Cheers!
@SpringfieldAndWestern
@SpringfieldAndWestern 5 ай бұрын
Hi Lance, thanks for the cool operations video. It once again shows how much time is needed for something that looks like a very easy and quick switch out at first. I have just started to build a tiny switching layout in N scale - let´s see how this goes.
@LanceMindheim
@LanceMindheim 5 ай бұрын
Glad you enjoyed it! Good luck with your layout.
@SpringfieldAndWestern
@SpringfieldAndWestern 5 ай бұрын
@@LanceMindheim Many Thanks! I try to document the built on my YT, take a look if you want 😁
@jonmilburn4878
@jonmilburn4878 5 ай бұрын
Excellent video Lance. I really appreciate all the prototype actions and to slow down. I did have a question, wouldn't the conductor ride the end of the last car a lot of the time to get back to the switch, drop off, etc instead of walking all the time? Love how you put some buildings right up the front of the layout, really adds to the depth. Also appreciate a little bit of unfinished layout, makes me feel better. They're never really finished. Glad I'm not the only one taking a sip of beer between moves. Keep up the excellent work
@bernicemeade3232
@bernicemeade3232 6 ай бұрын
Real nice looks great good gob
@roady1710
@roady1710 17 күн бұрын
I had a question for you about the poor couple that were sitting at the crossing in that black SUV. I was waiting for you at some point to push them over to the other side. They were going to go pick up their kids from school, but they’re running extremely late…
@15913Music
@15913Music 6 ай бұрын
Not a critique, just a different way of doing things. After going through the run around I would have told the engineer to clear the lead to the plant. I would drop off and realign the run-around, open the gate, and cross the street to line the power to the plant. Pull the empties before sporting the loads. Engineers prefer to run with the fewest cars possible, as much as possible. Though, in this case, it really is six of one, half a dozen of another. Same thing with leaving the plant. I would eyeball the cars past the plant switch, tell the engineer when to stop, and close the gate. Walk across the street and line myself back to the train. Also, we wouldn't be required to do an additional brake test in this situation. You would have given the cars a once-over before taking them out of the plant.
@goaliegeorge
@goaliegeorge 6 ай бұрын
Great info. Too many modelers forget about the people of railroading, and just quickly spot and run the trains with, I guess, Superman flying ahead to throw the the next turnout.. 😂👍🏻
@MyFingerLakesRailwayLayout
@MyFingerLakesRailwayLayout 6 ай бұрын
Man she sounds good when you notch up!
@LanceMindheimCustomModelRailro
@LanceMindheimCustomModelRailro 6 ай бұрын
You need to get up here and experience it in person Bill!
@MyFingerLakesRailwayLayout
@MyFingerLakesRailwayLayout 6 ай бұрын
@@LanceMindheimCustomModelRailro Man that would be cool. Would love to have you down here to haul some salt on the Finger Lakes Railway.
@beeble2003
@beeble2003 5 ай бұрын
I commented on episode 3 that your train was doing quite a bit less than the 10mph you estimated. Here, the train at 3:30 is doing about 10mph -- at around 4:20, the 60ft box car is passing a fixed point in about 4.5 seconds, which equates to about 9mph. And you mention it taking about ten minutes to run the 100ft length of the line -- again, that corresponds pretty much exactly to 10mph.
@trainmanroysmodelrailroadh7686
@trainmanroysmodelrailroadh7686 5 ай бұрын
Can you make a video of your buildings please
@PeterEllis-n7q
@PeterEllis-n7q Ай бұрын
Hi Lance, I am over in the UK and have modelled the GWR in 00 scale for many years. To rejuvenate my modelling mojo I am contemplating building a US H0 scale yard/switching layout and i find your videos inspirational and so helpful in explaining operational practice. I have a question for you regarding the control of the traffic lights on the highway crossing whilst switching. Would the conductor have access to the cabinet controlling the lights locally or would he radio an operational center to change the lights remotely as required. Regards Pete
@LanceMindheim
@LanceMindheim Ай бұрын
Hello Pete, I'm fairly sure he has a key and controls the signal via a box on a nearby utility pole. I doubt that they are remotely controlled.
@marztube6158
@marztube6158 6 ай бұрын
Another informative video, thoroughly enjoying watching the process. Keep 'em coming. Would the conductor have to set the brakes on the cars left on the runaround and would they engineer be required to use the horn/bell crossing 12th Ave?
@25mfd
@25mfd 6 ай бұрын
the brakes would automatically be set once they separate from the train because they would have had the air cut in... now, if the foreman wanted to he could set a hand brake or two... but with way less than a hand full of cars and because he's tying right back on, they're good with just letting the emergency brakes hold the train
@robertglietz7178
@robertglietz7178 6 ай бұрын
If you are cutting away from cars, the conductor is required to apply handbrakes. CSX's rule was 10% handbrakes on cars left standing. An engine operating over a public grade crossing is required to ring the bell and sound the horn, unless it's a designated quiet zone, which are generally found only on mainline tracks.
@marztube6158
@marztube6158 6 ай бұрын
Thanks for the info, that makes a lot of sense
@marztube6158
@marztube6158 6 ай бұрын
Thanks, that makes it easy for modelling
@jaydigshistory36
@jaydigshistory36 6 ай бұрын
Are those photos on the buildings of prototype walls/dock doors?
@LanceMindheimCustomModelRailro
@LanceMindheimCustomModelRailro 6 ай бұрын
Yes they are.
@robertsullivan3877
@robertsullivan3877 5 ай бұрын
Just in case you want to know,in the southwest ( Arizona, California and New Mexico/Texas), Trujillo is a Spanish name, and the "J" is silent, when pronounced.
@Yoss-ee2ms
@Yoss-ee2ms 4 ай бұрын
At 16:50, would you do the stretch after the handbrake is released?
@LanceMindheim
@LanceMindheim 4 ай бұрын
Good question, one which I'll leave to the pros to clarify. As a practical matter I would think that yes, it would be after.
@garfieldirwin
@garfieldirwin 5 ай бұрын
Lance, do you think using a DCC Protothrottle would enhance the switching experience?
@LanceMindheim
@LanceMindheim 5 ай бұрын
Maybe. The proto throttle isn't compatible with my system though (CVP).
@garfieldirwin
@garfieldirwin 5 ай бұрын
@@LanceMindheim Thats a good answer(!) but given the "prototypical" focus of your modeling/operations, I would have assumed it would be something you would approve of? Or not?
@JohnMakuck-is7be
@JohnMakuck-is7be 6 ай бұрын
I don't understand why you are crawling I know it's not the main but why to slow. gm
@KingTrump2024
@KingTrump2024 5 ай бұрын
Amazing layout !
Switching Operations 101, Episode 3: Switching scrap metal yards
21:55
Lance Mindheim's Railroad Channel
Рет қаралды 6 М.
Fun with Model Train Switching Puzzles
25:38
Model Trains & Colorado's Joint Line
Рет қаралды 87 М.
Don't underestimate anyone
00:47
奇軒Tricking
Рет қаралды 20 МЛН
How many people are in the changing room? #devil #lilith #funny #shorts
00:39
Чистка воды совком от денег
00:32
FD Vasya
Рет қаралды 1,9 МЛН
I thought one thing and the truth is something else 😂
00:34
عائلة ابو رعد Abo Raad family
Рет қаралды 8 МЛН
Switching Operations 101, Episode 9: No Business is Too Small!
19:20
Lance Mindheim's Railroad Channel
Рет қаралды 8 М.
Inexpensive DIY HO Scale warehouse or manufacturing facility?
7:54
Mike's Model Train Projects and Hobbies
Рет қаралды 3,1 М.
The Port of Los Angeles HO Scale Layout Project
5:59
Alkem Studios
Рет қаралды 233 М.
Mountain Switching: The Sequatchie Valley Railroad
15:58
Washington District Railfan
Рет қаралды 3,4 М.
Switching Operations using Lance Mindheim's method for small layouts.
8:52
SoCal Scale Models
Рет қаралды 29 М.
Tour of the £600,000 Train Room Part 1
18:22
Cheshire RailCraft
Рет қаралды 59 М.
Model Railroad Switching Operations Part 1
21:59
Steve Hellmann
Рет қаралды 9 М.
4 More Structures for the N Scale Switching Layout
16:57
Steve's Trains
Рет қаралды 10 М.
Don't underestimate anyone
00:47
奇軒Tricking
Рет қаралды 20 МЛН