Worked fine for me official PvE 23/07/2024. Earned a sub!
@Red_Tithe2 ай бұрын
How so ? I just tried on official pve and the issue I have is that the elevator tracks are too tall, ending up flush with the top ceiling, not below it like in the video.
@Red_Tithe2 ай бұрын
Nvm figured it out had to disable snapping first 🤦
@FlankV22 ай бұрын
@@Red_Tithe just saw this haha glad you fixed it x
@Ducky._.4579 ай бұрын
Mate there’s a way cheaper way. Put a beam through the centre of ceiling by putting a quarter wall below it then attach a pillar to the inside of it, from there place the beam across the ceiling. To carry on the line simply alternate from pillar to beam them pick the pillars up. After that place a display case on the beam and then 2 tables on top of that and voila your dedis will sit perfectly flush with the floor.
@zachromley8 ай бұрын
doesnt work for me atm to many structures
@HT-gv1be5 ай бұрын
Can you do a vid??
@The_Atheist_Carpenter56259 ай бұрын
One for the rythm✌
@MyDogSierra9 ай бұрын
Are you able to remove the tracks under them?
@Voxesto9 ай бұрын
No, they don't give their own support like they did on ASE.