Рет қаралды 1,386
On behalf of TAQA Onshore BV, Buitink Technology produced and installed the tensioned membrane and steel cable systems for the loading dock of the gas storage in Bergermeer, The Netherlands. FATZER AG Wire Ropes produced and assembled 8 full locked coil ropes, ø 40mm as well as 15 open spiral strands, ø 24-32mm.