Things are starting to come together! Here we attempt to install the most prized part of the whole system, the turbine! How'd it go? Well let's just say there is a part 2...
Пікірлер: 27
@afg54tre10 ай бұрын
A great example of why you pressure test piping before putting it in service. Also you need a strainer and a relief valve ahead of the turbine. Easy to clog those nozzles and if you do it could hammer and break that PVC in a second.
@afg54tre10 ай бұрын
And a gate valve isn’t the right valve to throttle the water flow. If you leave it cracked open like that the seat is going to erode and the valve won’t seal. Ball valve or glove valve would be better.
@manvsland10 ай бұрын
@afg54tre You're absolutely right! Should have pressure tested but luckily everything was ok. I'd love to put a strainer in before the turbine that was more easily accessible than taking apart the whole show but not sure how... Also never heard of a glove valve so I'll have to look into that - thanks!
@ktmrider759210 ай бұрын
I got both my turbines from Spencer .super knowledgeable guy. I wouldn’t have ever been able to complete my solar / hydro project without him
@markmacleod69713 ай бұрын
Make that bushing thinner. just sand it down a bit . put teflan tape on all the connections and you should be good to go.
@manvsland3 ай бұрын
That's a great idea actually. Should be easy enough to sand down eh...Thanks!
@udos469 ай бұрын
congratulations for the excellent work
@manvsland9 ай бұрын
Thank you!
@udos469 ай бұрын
@@manvsland Haven't you thought about putting a second pipe further down and another micropelton with the clean, swirled water, instead of wasting it in a fish pond? I have clients with this system as well as a customer instead of an electric generator, he has a stainless steel gear pump to bring water up I write advice out of passion...ecologically
@udos469 ай бұрын
at 11"29 you can see the entire change in diameters for the flow of water, it should be progressively conical so as not to create turbulence disturbances which cause a loss of power, ditto for corners in the pipes... and ball valves (look internally at an open tap and ..... Good work
@manvsland9 ай бұрын
Do you know how to achieve a progressively conical reduction from 3" to 1/4"? It's a great idea and would definitely reduce turbulence. I just used available schedule 40 pieces...
a fireman's lance is conical just to give maximum performance
@manvsland9 ай бұрын
@udos46 Haha maybe I could modify a fireman's lance to spin the turbine! There's an idea 😂
@riigel7 ай бұрын
hahah what a surprise 😂
@manvsland7 ай бұрын
oops :)
@SurvivalSquirrel10 ай бұрын
Did you let the glue cure?
@manvsland10 ай бұрын
Haha no, patience is not my strongest suit...
@SurvivalSquirrel10 ай бұрын
How old is this turbine? Where did you get it from?
@manvsland10 ай бұрын
This turbine was made new for me with the specs from my system. It was made by Langston's Alternative Energy
@SurvivalSquirrel10 ай бұрын
@@manvsland Thats a bit surprising to me. It should not have straigt up walls, as those would direct water up, hitting the wheel again, and causing energy losses! Also the more water goes up, the more water will get into the bearing.