Timelapse parkeergarage Meelfabriek 1e helft 2019

  Рет қаралды 4,775

Van der Wiel Bouw

Van der Wiel Bouw

5 жыл бұрын

Timelapse van de werkzaamheden aan de parkeergarage van de meelfabriek van 01--01-19 t/m 23-07-19.
www.demeelfabriek.nl
www.vanderwielbouw.nl

Пікірлер: 6
@garytischik7350
@garytischik7350 4 жыл бұрын
Hi i live in Armstrong BC Canada been watching for 5 months now the dutch are unbelievable builders love to go there one day on my bucket list
@vanderwielbouw9739
@vanderwielbouw9739 4 жыл бұрын
Nice to hear we have viewers from Canada. Thanks for your compliments.
@BlueBORG
@BlueBORG 4 жыл бұрын
Ik begrijp het niet ... Waarom al de sortering dan het vuil eruit halen, vul het met water en doe er dan wat eruit ziet als steen erin terug. Ik kom uit de Verenigde Staten en bekijk deze feed nu al een paar maanden ... erg interessant ..
@BlueBORG
@BlueBORG 4 жыл бұрын
I don't understand... Why all the grading then take dirt out fill it with water then put what looks like rock back into it. I'm from the United States have been watching this feed for a couple months now.. very interesting..
@vanderwielbouw9739
@vanderwielbouw9739 4 жыл бұрын
Great to read that you are watching us from across the ocean! First of all sheet piles were put in the ground around the building site to excavate dirt for first 5-6m. To stabilize the sheet piles braces we’re put in at two levels after this site was filled up with water because sheet piles are not 100% watertight and to create a dry site drainage has to be installed which has some difficulties. Because of the ground water level in the surrounding area water pressure on the sheet piles is big and also drainage will cause the ground water levels to drop outside the building site which will cause problems with foundations of existing buildings near our site. After site was filled excavation was continued to about 11-12 meters deep which is finished now. In recent weeks a gravel bedrock was applied on the bottom on which a concrete slab will poured which functions as a plug to keep water out of the building site. Concrete will be poured underwater. After the curing of the concrete slab water will be pumped out of the building site. On top of the concrete slab there will be a layer of sand, because concrete layer isn’t completely flat, on which the lowest floor of the parking garage will be created. Hope this clarifies the activities on the site. Kind regards, Van der Wiel Bouw bv
@BlueBORG
@BlueBORG 4 жыл бұрын
@@vanderwielbouw9739 Thank you for the quick reply... makes it very clear now.. :)
Bouw Meelpakhuis op het terrein van De Meelfabriek in Leiden
Van der Wiel Bouw
Рет қаралды 1
How does a wind turbine work?
13:33
Weet Je Dat Ook Weer
Рет қаралды 196 М.
КАРМАНЧИК 2 СЕЗОН 7 СЕРИЯ ФИНАЛ
21:37
Inter Production
Рет қаралды 523 М.
Can You Draw A PERFECTLY Dotted Line?
00:55
Stokes Twins
Рет қаралды 101 МЛН
THEY WANTED TO TAKE ALL HIS GOODIES 🍫🥤🍟😂
00:17
OKUNJATA
Рет қаралды 20 МЛН
This is how salt will warm up your house
12:42
Universiteit van Nederland
Рет қаралды 190 М.
Schoof zet JAMMERENDE Jetten op zijn PLEK! 'Dit PIK IK NIET!'
8:03
Politiek Inzicht
Рет қаралды 17 М.
Na onze vakantie...
1:57
Bernini toren Rottterdam
Рет қаралды 165
Comfortabel ongelukkig blijven - @TheRealMisterMindset Michael Pilarczyk
16:15
Ondernemend de podcast
Рет қаралды 12 М.
Zwaar onweer 9 juli 2024 (omgevallen bomen, windstoten, hagel, ...)
3:49
Parkeergarage de Meelfabriek - Timelapse 2019
4:10
Van der Wiel Bouw
Рет қаралды 5 М.
Timelapse werkzaamheden Parkeergarage 2019 in 45 fps
2:47
Van der Wiel Bouw
Рет қаралды 1,1 М.