Рет қаралды 2,779
VolkerRail's joint venture MPT has been contracted to build the brand new £350m Trafford Park Line which will start operating from April 2020.
The new line will run from the existing Pomona Metrolink stop, through Trafford Park, terminating at intu Trafford Centre.
The 5.5 km route will feature six new tram stops:
•Wharfside: Next to Manchester Ship Canal and close to Manchester United Football Club.
•Imperial War Museum North: Positioned by the world-renowned museum with access to MediaCityUK via the existing footbridges.
•Village: On Village Way, near Village Circle and Third Avenue.
•Parkway: At the existing Parkway Circle roundabout. The stop will include a Park & Ride with spaces for approximately 200 vehicles.
•EventCity: By Barton Square and EventCity.
•Trafford Centre: At intu Trafford Centre, Barton Dock Road.
*All stop names are subject to confirmation