Рет қаралды 4,294
Replacing a shredded timing belt on the rear engine. New input shaft, main bearing and reverse gear for the front transmission.
Build list:
2- d16y7 bottom ends
2- d16y8 heads
2- 92-95 si transmissions
welded diff in the rear transmission
LSD in the front transmission
2- oil pressure gauges
1 gas pedal, 2 cables
1 clutch pedal, 2 master/ slaves
2 sets, traction bars
11 gallon fuel tank, 255 pump
2- sets of solid mounts