Understanding PUTT Communication Assisted Protection Schemes

  Рет қаралды 14,332

Valence Electrical Training Services

Valence Electrical Training Services

4 жыл бұрын

We're continuing our end-to-end testing series by looking at the Permissive Under-Reaching Transfer Trip communication-assisted trip schemed. You can read the transcript at relaytraining.com/understandi...
You can play with these animations at our website relaytraining.com/. Each of the most commonly applied protection schemes have their own animations and they can be found at relaytraining.com/tag/end-to-...
This video expands on the descriptions found in The Relay Testing Handbook: Principles and Practice, Testing Line Distance Protective Relays (21), and End-to-End Testing. You can order any of these books in print or as digital pdf downloads at our store (relaytraining.com/product-cate....

Пікірлер: 16
@raheemelsayed
@raheemelsayed 3 жыл бұрын
Thank you, very nice animations that helped me understanding these parts 3 months ago.
@sherubwangdi8552
@sherubwangdi8552 3 жыл бұрын
thank you guys for such intuitive video. It was really helpful!!
@leticia06408
@leticia06408 3 жыл бұрын
Thank you for this amazing explanation!
@shakirjilani1424
@shakirjilani1424 3 жыл бұрын
Very well explained
@nishanthdmi
@nishanthdmi 3 жыл бұрын
Nice video..
@Lyngaae
@Lyngaae 3 жыл бұрын
I would love if you would compare POTT vs PUTT, cause I can't see the difference. Yes i understand that the PUTT only transfer a Z1 puckup, and POTT looks at Z2 pickup. But could you make an example where it would behave differently? Thank you.
@Relaytraining
@Relaytraining 3 жыл бұрын
The POTT Video at kzbin.info/www/bejne/rIe2dXhrbtt9osU shows an example of a POTT scheme failure that wouldn't have happened if a PUTT scheme was applied because the Under-reach transfer trip signal would never have been sent in the first place
@tossapolpholthip4338
@tossapolpholthip4338 2 жыл бұрын
@@Relaytraining is this mean we should choose PUTT over POTT? Is there any advantage of POTT over PUTT. Some one told me it is faster but I'm not quite understand because at the fault location we consider z1 and z2 pickup happen at the same time.
@Relaytraining
@Relaytraining 2 жыл бұрын
@@tossapolpholthip4338 I think so. The only argument I've ever heard for POTT over PUTT that made any sense was if you have a very weak source, and I've forgotten the part that makes sense as I write this.
@Relaytraining
@Relaytraining 2 жыл бұрын
@@tossapolpholthip4338 There is no difference in speed between POTT and PUTT at the same location with the same relays. The Zone 1 and Zone 2 math is the same inside the relay. All delays are caused by communication between devices, which would be the same regardless of POTT or PUTT.
@tossapolpholthip4338
@tossapolpholthip4338 2 жыл бұрын
@@Relaytraining when fault occurs the impedance Z will quickly decrease from load impedance to fault impedance in zone 1 and it should hit zone 2 barrier before it hit zone 1 hence z2 pickup should happen before z1 pickup/trip. I’m not so sure about above statement so I need second opinion. But if the impedance just jump to z1 then z1 and z2 should pickup at the same time.
@user-om9ro7vw3e
@user-om9ro7vw3e Жыл бұрын
thanks sir which program for simulation
@Relaytraining
@Relaytraining 11 ай бұрын
We had it custom made in articulate
@lyapunovxxx5659
@lyapunovxxx5659 Жыл бұрын
Joia
@seandavis480
@seandavis480 2 жыл бұрын
Lol
Understanding Permissive Over Reaching Transfer Trip POTT Communication Assisted Trip Schemes Video
11:05
Llegó al techo 😱
00:37
Juan De Dios Pantoja
Рет қаралды 61 МЛН
Mama vs Son vs Daddy 😭🤣
00:13
DADDYSON SHOW
Рет қаралды 51 МЛН
WORLD'S SHORTEST WOMAN
00:58
Stokes Twins
Рет қаралды 133 МЛН
Transmission Line Protection (21)
9:12
Valence Electrical Training Services
Рет қаралды 173 М.
Testing a Distance Relay Teleprotection Scheme
3:53
OMICRONenergy
Рет қаралды 30 М.
Understanding Different Transmission Line Protection Schemes
1:33:07
Electrical Engineering Knowledge Sharing
Рет қаралды 6 М.
Understanding Line Distance protection (21)
11:06
Valence Electrical Training Services
Рет қаралды 173 М.
Permissive Overreach Transfer Trip (POTT) Scheme for Distance Relay
9:56
RELAY PROTECTION ELECTRICAL
Рет қаралды 2,5 М.
Direct Transfer Trip and Direct Under-Reaching Transfer Trip Schemes Video
4:55
Valence Electrical Training Services
Рет қаралды 35 М.
📱магазин техники в 2014 vs 2024
0:41
djetics
Рет қаралды 709 М.
Klavye İle Trafik Işığını Yönetmek #shorts
0:18
Osman Kabadayı
Рет қаралды 9 МЛН
$1 vs $100,000 Slow Motion Camera!
0:44
Hafu Go
Рет қаралды 29 МЛН
Rate This Smartphone Cooler Set-up ⭐
0:10
Shakeuptech
Рет қаралды 7 МЛН