We're continuing our end-to-end testing series by looking at the Permissive Over-Reaching Transfer Trip communication-assisted trip schemes. You can read the transcript at relaytraining.com/understandi...
You can play with these animations at our website relaytraining.com/pott-animat.... Each of the most commonly applied protection schemes have their own animations and they can be found at relaytraining.com/tag/end-to-e...
This video expands on the descriptions found in The Relay Testing Handbook: Principles and Practice and The Relay Testing Handbook: End-to-End Testing. You can order any of these books in print or as digital pdf downloads at our store (relaytraining.com/relay-testi....

Пікірлер: 23
@abhishek894
@abhishek894 5 жыл бұрын
I have watched all the five videos. They were elegant and the animations were spot on. Thanks for sharing.
@ravi261986
@ravi261986 2 жыл бұрын
This what i searching for last few weeks really very nice presentation and thanks for making available in free videos
@mominhamdani4012
@mominhamdani4012 6 ай бұрын
excellent video. Thanks for sharing
@shibbanik7312
@shibbanik7312 6 жыл бұрын
You are doing an excellent work. Keep it up.
@Sl4gyster
@Sl4gyster 6 жыл бұрын
Thanks for the videos. Really well explained.
@fredr4258
@fredr4258 6 жыл бұрын
Watched 1st 5 vids. GREAT information, good presentation and easy to understand. Thank you so much for sharing!
@namphonethevasisomsack6125
@namphonethevasisomsack6125 6 жыл бұрын
Thanks for your explain
@phamphuong7931
@phamphuong7931 2 жыл бұрын
Thanks ad for good video!
@intrudentalert3172
@intrudentalert3172 4 жыл бұрын
Very clear and informative. Please make a video regarding weak infeed condition.
@Relaytraining
@Relaytraining 4 жыл бұрын
We made a post for weak infeed at relaytraining.com/please-explain-principle-weak-infeed-echo-permissive-reach-transfer-trip-schemes/?highlight=weak%20infeed
@raobonala8818
@raobonala8818 6 жыл бұрын
Thanks for the great animation to explain the chronology of fault duration and BKR operations. However, in this video of POTT, the parallel line relays (relay 5 and 6) operations is not understood. - Before BKR1 is tripped Relay 5 is detected Zone 3 fault and after the BKR 1 is tripped the fault current direction is changed and Zone 2 fault is detected. - But, how Relay 6 which is detecting Zone 2 fault before BKR 1 trip, is still detecting Zone 2 fault even after Current reversal, not Zone 3? Hope you can clarify. Thanks again.
@Relaytraining
@Relaytraining 6 жыл бұрын
Thanks for the question. As stated in the video, nothing happens instantaneously. The two relays may detect the sudden current reversal simultaneously, but the local relay can detect a Zone 2 before the communication signal from the other relay changes.
@raobonala8818
@raobonala8818 6 жыл бұрын
Valence Electrical Training Services Thank you
@cristiandelaossa8296
@cristiandelaossa8296 6 жыл бұрын
Thanks for yours explanations are really clear and so good @Valence Electrical Training Services, could you help me with a doubt I can not see a difference between PUTT and POTT scheme, could you or somebody show me the difference between these schemes Thanks for advantage
@Relaytraining
@Relaytraining 6 жыл бұрын
PUTT uses Zone 1 because it Under-reaches. POTT uses Zone 2 because it over-reaches
@ALIK283131
@ALIK283131 5 жыл бұрын
pls share one video of weak infeed scheme also..
@owaiselectrical
@owaiselectrical 4 жыл бұрын
As you said that when reversal of current occurs, relay5 will detect Zone2. But actually fault seems to be in a zone which is more than120% for Relay5. Can you explain.
@Relaytraining
@Relaytraining 4 жыл бұрын
Follow the current flow through relay 5 before and after the reversal remembering that the two parallel line ends are basically on top of each other impedance-wise
@esudeepshrestha
@esudeepshrestha 5 жыл бұрын
For relay 5 & 6 are we still talking about the same fault shown between relays 1 & 2? Or relays 5 & 6 see a fault within between them to activate zone 1 or zone 2. Thank u. Really enjoyed the video and have watched at least 5 times now.
@Relaytraining
@Relaytraining 5 жыл бұрын
Yes it is the same fault. Relay 5 initially sees a fault behind it because of the current flow. Relay 6 could possibly see it as a Zone 2. Everything changes when Bkr 1 opens because the currents all suddenly change direction and it becomes a race of who see what when.
@esudeepshrestha
@esudeepshrestha 5 жыл бұрын
Thanks for the explanation. Appreciated
@loganathan7862
@loganathan7862 3 жыл бұрын
How to choose permissive schemes (PUTT or POTT) for a line?
@Relaytraining
@Relaytraining 3 жыл бұрын
You have to do a system study to see if your system has enough energy to over-reach or under-reach, then decide whether you want security or reliability.
Understanding PUTT Communication Assisted Protection Schemes
9:25
Valence Electrical Training Services
Рет қаралды 14 М.
Spot The Fake Animal For $10,000
00:40
MrBeast
Рет қаралды 197 МЛН
Phasor Diagrams for Relay Testers
10:43
Valence Electrical Training Services
Рет қаралды 43 М.
Permissive Overreach Transfer Trip (POTT) Scheme for Distance Relay
9:56
RELAY PROTECTION ELECTRICAL
Рет қаралды 2,5 М.
Understanding Different Transmission Line Protection Schemes
1:33:07
Electrical Engineering Knowledge Sharing
Рет қаралды 6 М.
Understanding Line Distance protection (21)
11:06
Valence Electrical Training Services
Рет қаралды 173 М.
Permissive Underreach Transfer Trip (PUTT) Scheme for Distance Relay
9:20
RELAY PROTECTION ELECTRICAL
Рет қаралды 2,3 М.
What does "impedance matching" actually look like? (electricity waves)
17:08
Scrambling onto trucks for a better life
3:58
Sky News
Рет қаралды 11 МЛН
8 Pin Relay Explained
8:52
Craig Michaud- Electrical Instructor
Рет қаралды 135 М.
RADIAL SOCKET SPURS. How to install them correctly and safely.
10:18
LEARN ELECTRICS
Рет қаралды 70 М.