Рет қаралды 6,479
The single-story facility started with only 4 loading docks, but with the new addition, now boasts twenty-four (24) loading docks, 8 drive-in bays and a 31’ ceiling height.
Twenty (20) new Blue Giant overhead loading dock doors and dock levelers were designed and installed by our team, with modifications to the existing building structure and the underpinning of the existing footing as required. The scope of work also included adding concrete retaining walls with fall protection, and site modifications to lower the existing grade at the new dock positions to a height to allow warehouse equipment to access the trucks.
Muhlenberg Greene Architects provided design documentation for the new 20 docks, detailing of site/interior modifications for a proposed tenant, architectural design, structural engineering services and civil engineering design assistance. We were also on hand to answer any questions that building code officials and contractors may have had during the process.