Рет қаралды 6,368
Tramwaje Warszawskie, Warszawski Transport Publiczny (WTP) - New Winnica terminus just after the opening at 4 AM. Greetings to everyone participating in this "outstanding" event.
Recorded on 2021-09-04.
I apologize about the intense shakes in some parts of the video, keeping the image stabilized is much harder while zoomed, and besides that it was 4 AM in the night.
Other videos from the opening:
Full ride on first tram - • Warszawa - Pierwszy ku...
Ride to Metro Młociny - • Warszawa - Przejazd tr...
0:00 Arriving to the Winnica terminus on the first line 2 tram (Pesa 128N Jazz Duo #3627)
3:26 Departure of the first line 2 tram to the terminus
3:48 Arrival of the first line 17 tram (Pesa 120Na Swing #3179)
4:46 Departure of the line 17 tram to the terminus
5:45 Departure of the first line 2 tram in the direction of Metro Młociny
6:40 Awizonosz chasing the line 2 tram
7:04 Departure of the line 2 tram from Grzymalitów stop
7:38 Departure of the line 17 tram from the terminus
9:22 Arrival of another line 2 tram (Pesa 128N Jazz Duo #3628)
10:44 Arrival of another line 17 tram (Pesa 120Na Swing #3281)
12:14 Installing the stop markings on Winnica 04 stop
14:18 Another line 2 tram (Pesa 120NaDUO Swing #3506)
15:15 Another line 17 tram (Pesa 120Na Swing #3265) - changing the rail switch manually
17:12 Departure of a line 2 tram (Pesa 120NaDUO Swing #3506) in the direction of Metro Młociny
17:32 Reversing the line 17 tram to the terminus, arrived to the next stop too early
18:41 Arrival of another line 2 tram (Pesa 128N Jazz Duo #3628)
20:27 Departure of the line 17 tram