Drone video from the construction of SOP (Sofia Ring Road) from residential complex "Mladost" to highway "Trakia"
The beginning of the section is at km 41 + 100, where the road junction "Mladost" is being built and which will be an overpass for the direct direction with a roundabout on the lower level. The end of the section in progress is at km 35 + 180 at the already existing clover of SOP with the beginning of the highway "Trakia".
There are 4 road junctions along the route - one of them is a diamond, the others are an overpass for the transit of the upper and roundabout below it for all other connections.
The local lanes in the whole section are one-way and coincide with the direction of movement of the central lane. Along the length of the section, intertwining zones are also provided for connection between the central lane and the local lanes with a length of 120 meters each. The sidewalks are 2 meters wide and will be tiled. Three pedestrian walkways will be built at km 36 + 156.14, km 36 + 846.12, km 37 + 314.75.
Total length: 6.08 km
Design time: 180 days
Deadline: 730 days
Warranty periods:
- for construction and installation works without road facilities: 5 years
- for road facilities: 10 years
Construction supervision: SOP-SOUTH 2018 ASSOCIATION
Contract value: BGN 1,856,808 with VAT
You can see a 3D project of the entire route here:
• 3D проект на Софийски ...
Video: SOP from zk. Mladost to Trakia highway
Video Format: 4k
Date: 01.11.2020
Music: Royalty Free Music from Bensound
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is violation of the licence under which this video is available on KZbin platform