Рет қаралды 21,325
Filmed back in 2009 before Hansons Machen Quarry lost the contract to supply Network Rail with ballast, Mendip Rails 08296 loads a train of HQJA Autoballasters, once loaded the train is moved to the Lower Machen reception loop were each portion will be coupled together form one train for the working to AD jcn. 66094 arrives at the quarry with the final portion of the train for loading, 094 will then return to the reception loop to work the loaded train foward.