Рет қаралды 105,478
Cutting the floor from the utility bed to raise it 7 1/2". Setting the bed back onto the frame to get the floor level, measured and welded. Pulling the bed off to fix gaps left by the channeling and welding it up one last time. Setting the bed back onto the truck to build the tunnel over the rear end. Installing a gauge to read air pressure in the bags. Cutting, braking and bead rolling sheet metal for the tunnel. Installing rivet nuts to fasten down the sheet metal before color matching the bed back to yellow.