24. Semaphore signalling - Prt 1- Building ratio kits and discussing positioning

  Рет қаралды 12,079

Horsehay Railway Modeller

Horsehay Railway Modeller

Күн бұрын

Пікірлер: 13
@jonsloftrailway
@jonsloftrailway 7 ай бұрын
Well done, great video and helpful as I will be making and placing signals on my layout soon 😊
@NicholassTrainChannel
@NicholassTrainChannel 3 жыл бұрын
Nice work mate those signals look great.
@thomasdecker7631
@thomasdecker7631 3 жыл бұрын
Looks good. One thing I would recommend is using red decal film to apply the red stripe to the ground signals. Would likely be much easier than painting.
@HorsehayRailwayModeller
@HorsehayRailwayModeller 3 жыл бұрын
I hadn't thought of that, I'll bear that in mind as I'm sure these won't be the last signals I'll ever make. Thank you
@Sorarse
@Sorarse 2 жыл бұрын
A ground shunt signal is also a stop signal, but will not indicate which route has been set, as you would need to clear them for a train to proceed whichever way the point ahead is set. What you probably need in a number of those locations is a ground signal with a yellow band. This type of signal allows a train to pass for shunt moves on the minor line, but needs to be cleared if the train is to proceed on to the major route.
@daviddinenage8598
@daviddinenage8598 Жыл бұрын
The yellow shunt signal is used on siding exits only. When on, it can be passed to shunt into a spur. When off, it will route to the main line. The GWR did not use many of the yellow type, using a normal red disc or a ringed 2/3ft arm for siding exits. On the above layout, it is doubtful if anything other than single discs would be used. The situation therefore arises where a red disc can be passed at danger. For example, a trailing connection into a main line; the disc will only be allowed to clear if the points are set into the siding. For set back moves, the disc would not be cleared.
@_RandomPea
@_RandomPea Жыл бұрын
​@@daviddinenage8598 Think I'll need your expertise to point me in the right direction on signal placement... Excuse the pun 😂 do you have any good advice on articles that would mean I wouldn't get mine horribly wrong?
@daviddinenage8598
@daviddinenage8598 Жыл бұрын
@@_RandomPea Looking at the video, the shunt signals look in the correct places. Generally, the GWR would only use single discs. The discs for the trailing crossover would only be cleared if the crossover points are pulled off. For a train reversing into the one of the sidings, only the disc for the siding would be cleared. The crossover disc would remain on (at danger).
@gwrdriver1660
@gwrdriver1660 2 жыл бұрын
Hi, maybe you could use the signal arms off of the junction signal that you aren't going to use, on your other home signals because the specticle lenes are better., Cheers Rich
@ShaneRHDR
@ShaneRHDR 3 жыл бұрын
Hi David love the videos but in regards to your signaling the home signal you placed to protect the station is on the wrong side, in real life it would likely be a tall signal with a repeater higher up to allow sighting from around the bend.
@HorsehayRailwayModeller
@HorsehayRailwayModeller 3 жыл бұрын
Hi mate thanks for the comment. I had originally got it on the other side but was advised by a group of ex br signallers on rm web to move it across the lines and put it closer to the crossover. I get where your coming from, I think when it comes to signalling there are many ways to do the same thing.
@daviddinenage8598
@daviddinenage8598 Жыл бұрын
@@HorsehayRailwayModeller The GWR would have put the signal where you have, 'wrong' side. Remember, GWR engines had the driver on the right. Co-acting arms were not that common on the GWR. As regard to disc signals; see my comment above.
@jonsloftrailway
@jonsloftrailway 7 ай бұрын
Could the home signal be placed between the two lines or was that not normal practice?
25. Semaphore signalling - prt 2- DIY Catch points
11:12
Horsehay Railway Modeller
Рет қаралды 2,3 М.
Rail Joints on Lift Sections
8:22
Wallsrail
Рет қаралды 374 М.
人是不能做到吗?#火影忍者 #家人  #佐助
00:20
火影忍者一家
Рет қаралды 20 МЛН
Сестра обхитрила!
00:17
Victoria Portfolio
Рет қаралды 958 М.
Mom Hack for Cooking Solo with a Little One! 🍳👶
00:15
5-Minute Crafts HOUSE
Рет қаралды 23 МЛН
Heritage Audio - Connections & Features
4:27
Heritage Audio
Рет қаралды 136
Ratio 460 Signal with LED and SmartSwitch control
11:09
PECO TV
Рет қаралды 33 М.
Motorising OO gauge Ratio signals
16:04
keepcalm makestuff
Рет қаралды 14 М.
Building A Modular Model Railway! - Episode 13 - Working Semaphore Signals
20:06
That Model Railway Guy
Рет қаралды 43 М.
Automating Semaphore Signals
3:51
Heathcote Electronics
Рет қаралды 11 М.
Mechanical Railway Signalling - An Introduction
29:30
ExeterWestGroup
Рет қаралды 35 М.
I Built a Complete Model Railway in 8 weeks - Port Dinorwic
18:42
Kathy Millatt
Рет қаралды 233 М.
Basics of Railway Signalling - Absolute Block - Easy to understand!
22:17
Horton Common Model Railway
Рет қаралды 18 М.
Install a Working Semaphore Signal from Dapol
26:45
Jennifer E. Kirk Model Railways
Рет қаралды 14 М.