Big job Chris , we haven't seen much of you and James, more video's please, Take care
@johnwaby43217 ай бұрын
Looking like a very nice job .pity about the cold and the mud . Nice 3 phase supply to split the load up 👍👍👍
@brianoneill3507 ай бұрын
Good man Chris. Last one I came across, electrician would not dig. I had to dig it out and then he connected as I don't yet have the Part P for connecting shed. Fair dues if you dug that out
@BerkeleyTowers7 ай бұрын
Yep, like dj, why bring all 3 phases out there?
@superfox697 ай бұрын
Does he mean it’s 3 phase at the house and one of the phases has been brought up to the summer house? I’d like to know if it’s pme and will need a separate earth rod?
@ADAMBRADY047 ай бұрын
What's the reason for the install being 3 phase for such a small building
@Mc674bo7 ай бұрын
Hi It looks quite a long run from the house so I assume it’s a decent size cable , which is bound to be there core at least . So It would make sense to put a three phase supply in , if nothing else it gives the ability to sub feed off if required . Also the proposed shower would impact the loading on a single phase supply . I must admit it will be interesting to see what the earth loop impedance is on completion , but knowing how proficient this electrical contractor is , I’m sure he has all those things covered . 👍
@Mc674bo7 ай бұрын
Sorry meant four core with separate earth silly me , been retired now I must be losing the plot 😂