How to Wire Acuvim II Power Meter into Three-Phase Power System by Accuenergy

  Рет қаралды 67,297

Accuenergy Corp

Accuenergy Corp

Күн бұрын

Пікірлер: 24
@otreborsolrac2
@otreborsolrac2 5 ай бұрын
I have a doubt, I only want the device to measure the frequency, do I need to connect the CT?
@nadakhater23
@nadakhater23 3 жыл бұрын
Does this meter have an analog output which can be used for sending data to a server ??
@Mdhunk2008
@Mdhunk2008 10 жыл бұрын
thanks thanks a lot for these video ....
@lamjan100
@lamjan100 9 жыл бұрын
thank so much for wiring video
@michaelmcguire3198
@michaelmcguire3198 5 жыл бұрын
SO, with a Rowgowski coil, that doesn't come with the S1/H1, etc. designation, we would point the arrow in the direction of current flow FROM THE UTILITY, and not the parallel generation current flow...? Thanks, Mike
@rukhsar07
@rukhsar07 8 жыл бұрын
Thanks find impressive & learned
@Bob-mp4sb
@Bob-mp4sb 7 жыл бұрын
can connector be used as the utility side. if not what device can be used for a mini project
@MotorsportsX
@MotorsportsX 11 ай бұрын
why does A(V) go to L+?
@selvakiruba9626
@selvakiruba9626 7 жыл бұрын
what is the name of CT used in video??
@itpconstrucioninc8994
@itpconstrucioninc8994 6 жыл бұрын
hello. if we have 125mm² wire size what is the size of the wire we are going to use from current transformer to terminal block and to KW meter (its only a submeter). thank you.
@itpconstrucioninc8994
@itpconstrucioninc8994 6 жыл бұрын
i learned something from this video. but my problem is the wire we are going to use. thanks
@easyjob1705
@easyjob1705 8 жыл бұрын
thank...informative...now iwill check why my meter is running backward...any help pls
@KrishnaYadav-B
@KrishnaYadav-B 8 жыл бұрын
please upload the video to connect the input and output connection of wire in sub-meter in nepal.
@keanchoung3153
@keanchoung3153 6 жыл бұрын
THANKS FOR METHOD OF WIRING. Can you help upload video to learn to set this meter ? thank you in advance !
@Accuenergy
@Accuenergy 6 жыл бұрын
Hello Kean, Here's the link with complete setup/configuration steps, including text, PDF and video: www.accuenergy.com/page/articles/configure-acuvim-ii-via-meter-display Feel free to reach out for any questions, thank you.
@keanchoung3153
@keanchoung3153 6 жыл бұрын
well noted and thank for your video.
@keanchoung3153
@keanchoung3153 6 жыл бұрын
I love technical video and pdf.
@gujar5546
@gujar5546 6 жыл бұрын
Good
@Bob-mp4sb
@Bob-mp4sb 7 жыл бұрын
what is at the load side
@Howarder12345
@Howarder12345 7 жыл бұрын
Hi Dewole, the load side represent energy consumption or energy receiving side, as opposed to utility side which is supplying energy. Typically you would have meters to monitor sub-panels/breakers for energy consumption
@Bob-mp4sb
@Bob-mp4sb 7 жыл бұрын
Howard Wang hello, i comfused because i have a little im working on. and this video as been the most helpful i can find online. what is the name of the product for the utility terminal block
@4some2joe0
@4some2joe0 4 жыл бұрын
Why green and not blue?
@kemelomarven3901
@kemelomarven3901 6 жыл бұрын
Why most electrician not connecting earth when they install kwh meter
@RickardoPandiangan
@RickardoPandiangan 6 жыл бұрын
If you didn't do correctly, you will blow your power meter. And there is no guarantee for blown things.
Quando A Diferença De Altura É Muito Grande 😲😂
00:12
Mari Maria
Рет қаралды 45 МЛН
Three-Phase Power Explained
9:58
Raritan
Рет қаралды 1,4 МЛН
Current Transformer Installation
3:11
IBKS
Рет қаралды 132 М.
Star / Delta 220 / 440
8:24
doubleboost
Рет қаралды 1,8 МЛН
Why there is no Neutral in Transmission Lines?  Explained | TheElectricalGuy
8:46
Gaurav J - TheElectricalGuy
Рет қаралды 283 М.
Measuring AC Current with Arduino
19:29
misperry
Рет қаралды 78 М.
Acuvim || Meter Programming Tutorial.
3:54
SAM
Рет қаралды 1,2 М.
CT Meter Connection Diagram | 3 Phase Energy Meter connection With CT
5:24
Sub Panels Explained - Why are neutral and ground separated?
16:22
The Engineering Mindset
Рет қаралды 1,6 МЛН