Рет қаралды 124,256
ALE transport a Siemens 200 tonne gas turbine from Goole West dock to Ferrybridge power station. 2 Trojan tractors and 20 row girder frame trailer. The load was height critical and at several locations en route stops were required to adjust the trailer running height.