APAD Trackwork & Associated Components Final Carefull Inspection.Kuchai - Kentomen underground sect.

  Рет қаралды 126

APADchannel

APADchannel

Жыл бұрын

Agensi Pengangkutan Awam Darat Trackwork & Associated Components Final Carefull Inspection.
Kuchai Station - Kentomen Station (through underground section)
The stations along the route (South to North)
1. Kuchai (Elevated)
2. Bandar Malaysia Selatan (Provision)
3. Bandar Malaysia Utara (Provision)
4. Chan Sow Lin
5. Tun Razak Exchange
6. Conlay
7. Persiaran KLCC
8. Ampang Park
9. Raja Uda
10. Hospital Kuala Lumpur
11. Titiwangsa
12. Sentul Barat
13. Jalan Ipoh (Semi Sunken)
14. Kentomen (Elevated)
Focus area are follows:
1. Cross Passage between South Bound and North Bound.
2. Underground Track Crossing.
3. Track Gauge and Power Rail.
4. Blue Light Station.
5. Sump Pump System.
6. Tunnel Structure and Leakages.
7. Handicapped Person Movement and Control.
8. Emergency Contact Point.
9. Operational Safety Protocol.

Пікірлер
Konservasi Lokomotive Seri Menanti
5:49
Jabatan Muzium Malaysia
Рет қаралды 16 М.
Kisah Jatuh Bangun Sistem Transit Rel Pertama di Malaysia
16:38
Fami Versi Bahasa
Рет қаралды 7 М.
когда повзрослела // EVA mash
00:40
EVA mash
Рет қаралды 4,3 МЛН
The Race to the South Pole - Mitsi Studio
9:14
Mitsi Studio
Рет қаралды 222 М.
What if many forks were made of salt?
7:13
Ben Walker
Рет қаралды 647 М.
CRL Mockup + KNS 3326 Preservation Showcase
7:09
snhyper
Рет қаралды 822
BRT Sunway - Projek RM630 Juta dan Masa Depan Sistem BRT
17:35
Fami Versi Bahasa
Рет қаралды 15 М.
France's Election Results Explained
8:06
EU Made Simple
Рет қаралды 1,8 МЛН
Vision To Evolution: The Breathtaking of Stadium Majlis Perbandaran Selayang Lighting Transformation
5:39