Рет қаралды 126
Agensi Pengangkutan Awam Darat Trackwork & Associated Components Final Carefull Inspection.
Kuchai Station - Kentomen Station (through underground section)
The stations along the route (South to North)
1. Kuchai (Elevated)
2. Bandar Malaysia Selatan (Provision)
3. Bandar Malaysia Utara (Provision)
4. Chan Sow Lin
5. Tun Razak Exchange
6. Conlay
7. Persiaran KLCC
8. Ampang Park
9. Raja Uda
10. Hospital Kuala Lumpur
11. Titiwangsa
12. Sentul Barat
13. Jalan Ipoh (Semi Sunken)
14. Kentomen (Elevated)
Focus area are follows:
1. Cross Passage between South Bound and North Bound.
2. Underground Track Crossing.
3. Track Gauge and Power Rail.
4. Blue Light Station.
5. Sump Pump System.
6. Tunnel Structure and Leakages.
7. Handicapped Person Movement and Control.
8. Emergency Contact Point.
9. Operational Safety Protocol.