Рет қаралды 5,864
Latest clips include the temporary footbridge installed recently and works being carried out to accommodate the new bridge and lifts to be installed later this year ( 2021). Other changes include the removal of the signal box and semaphore signalling. On the downside too, we don't see HSTs, coal trains or freight from Fords at Bridgend. More old clips from the Vale Line soon.