Basic of Structure: Unbalanced Moment | Why upper floor Columns Require more Rebar than lower floor

  Рет қаралды 38,815

DECODE BD

DECODE BD

Күн бұрын

Пікірлер: 59
@SavvyOlawale
@SavvyOlawale 3 жыл бұрын
Thanks Engineer! You just answered a very big and popular question here.
@Decodebd
@Decodebd 3 жыл бұрын
Glad to hear it!
@bhushanpatil5539
@bhushanpatil5539 3 жыл бұрын
Yes most important question ✌️😀
@hasithasandaruwanvidanapat1876
@hasithasandaruwanvidanapat1876 3 жыл бұрын
Is there any provisions that we shouldn't provide larger reinforcement in upper floor while smaller in lower? Y we need to continue the greater r/f percentage from top to bottom?
@logeshselvaraju2411
@logeshselvaraju2411 3 жыл бұрын
Thank you for the question which bugged me for long time. Thanks for your effort.
@heisenberg7924
@heisenberg7924 3 жыл бұрын
It's very informative for us,reallly does wonder while thinking of remedies for problems like this..unfortunately architects are so unmoved if you ask them for re orientations of columns, thank you for the video, and please post this kind of video more if possible..thank you again!
@bishalchaudhary4562
@bishalchaudhary4562 2 жыл бұрын
How to overcome such problems in etabs please explain
@infinixgaming_0
@infinixgaming_0 8 ай бұрын
Where we need to change in etabs to balance the moment. Pls anyone tell me. I am student 😢
@harshaldalal9765
@harshaldalal9765 3 жыл бұрын
Is it possible that we increase reinforcements at upper levels. May be not in top most story level, but from a level below from where reinforcements requirement increases ???
@dhirenderbisht4956
@dhirenderbisht4956 2 жыл бұрын
Very Informative.Thanks
@Decodebd
@Decodebd 2 жыл бұрын
Glad it was helpful!
@Paigham72
@Paigham72 Жыл бұрын
Sometimes Etabs show huge reinforcement at station Loc 0.0 in columns what is the reason and solution?
@priyankavichare3835
@priyankavichare3835 2 жыл бұрын
Nice work.
@yogeshbang
@yogeshbang 3 жыл бұрын
Could u pls mk a video on Dynamic analysis of wind with Gust factor calculations in excel sheet as per IS 875 part 3 2015.
@islahuddin2249
@islahuddin2249 3 жыл бұрын
aslamualkm you are one man army in whole youtube
@azmat_waseem
@azmat_waseem 3 жыл бұрын
Very Informative.... Shukran....
@Decodebd
@Decodebd 3 жыл бұрын
Afwan. Welcome.
@mahakbassi6467
@mahakbassi6467 3 жыл бұрын
superb video!
@nahidakhternishe6182
@nahidakhternishe6182 3 жыл бұрын
Great job 👍
@Decodebd
@Decodebd 3 жыл бұрын
Thanks 👍
@deepanshurawat9646
@deepanshurawat9646 3 жыл бұрын
If same situation occurs in shear wall also where reinforcement in bottom is high than it gradually decreases than gradually starts increases in upper floors
@anandsingh6441
@anandsingh6441 3 жыл бұрын
Wonderful explanation.
@Decodebd
@Decodebd 3 жыл бұрын
Thanks for your comment.
@mainuddinfaisal4532
@mainuddinfaisal4532 3 жыл бұрын
Thank you via.
@shaikhzoheb9025
@shaikhzoheb9025 3 жыл бұрын
Thanks sir , please make more videos like this
@Decodebd
@Decodebd 3 жыл бұрын
Welcome. In sha Allah.
@snehalshinde-t3016
@snehalshinde-t3016 3 жыл бұрын
What settings we have to do in Microsoft access so that our file convert fast
@sudarshannikam5243
@sudarshannikam5243 3 жыл бұрын
Very very thanks sir for this valuable information. Sir, it means that we should provide higher rebar to lower floor column which satisfies to upper floor column practically .We cant provide lower amount of steel to lower floor column than upper floor column thou it passes by design software. Sir can we say that column works only floor to floor action , that means it doesn't matter with vertical continuity regarding to its sectional dimension and required area of steel (Ast). In short my question is ,Can we leave lower sectional dimension of column and lower amount of steel (which satisfies the design) to that of the upper column practically on site? Sir ,Please make video on continuous beam and single span fixed beam, Regarding its mandatory requirement of continuity of top and bottom reinforcement, sectional property of beam through all span of continuous beam and their placing of top & bottom reinforcement. Can we design continuous beam as a fixed beam each span separately. Does it necessary to maintain same extra top bar at both side of intermediate support(column) or Is it necessary to maintain continuity for extra top bar ( for hogging moment purpose)? Can we provide different amount of Ast for extra top bar (Top curtail bar) to beam at both side of intermediate column support for continuous beam as per their own Ast requirement ? Because RCDC gives symmetrical bar arrangement for extra top bar which is max Ast among both side of intermediate column. It requires to provide unnecessary excessive Ast for extra top bar of continuous beam at one side of column due to maintaining symmetry of extra top bar at intermediate column (Max Ast among both side of continuous support for extra bar) .Does this symmetry maintain for moment distribution purpose or balance hogging moment at intermediate support ? Sir please make video on above topic ( Continuous beam Vs Single span fixed beam).
@krishnakantkarekar7760
@krishnakantkarekar7760 Жыл бұрын
Very good video
@Decodebd
@Decodebd Жыл бұрын
Thanks
@sothattheng8624
@sothattheng8624 3 жыл бұрын
Thanks for sharing!
@Decodebd
@Decodebd 3 жыл бұрын
Welcome
@blacklistednawabzada7140
@blacklistednawabzada7140 3 жыл бұрын
Sir can you help me with unbalanced monent in column?
@engrkaribul
@engrkaribul 3 жыл бұрын
thank you sir.
@Decodebd
@Decodebd 3 жыл бұрын
Welcome dear.
@praveenrajbhandari2298
@praveenrajbhandari2298 3 жыл бұрын
THANKS A LOT
@Decodebd
@Decodebd 3 жыл бұрын
Welcome
@paulkamp9596
@paulkamp9596 3 жыл бұрын
Great job!I want to ask you if you can show us core-outrigger system in high-rise buildings (Etabs or SAP)...if you want of course
@Decodebd
@Decodebd 3 жыл бұрын
Thanks. Noted.
@t7iou
@t7iou 3 жыл бұрын
Sir can you make one example of how to blance moments of colmn on one model
@tahsinsarkar7024
@tahsinsarkar7024 3 жыл бұрын
How much software does a good civil engr need to know?
@alhassanetoure3088
@alhassanetoure3088 3 жыл бұрын
Just 33
@prawingajbhiye8816
@prawingajbhiye8816 3 жыл бұрын
Thanks.
@Decodebd
@Decodebd 3 жыл бұрын
Welcome
@maheshtelange5132
@maheshtelange5132 3 жыл бұрын
Very nice sir👍👍 plz make toturial on footing design using is code in safe . For that old toturial model you uploaded ( multi storey building design etab v18 by is code)
@Decodebd
@Decodebd 3 жыл бұрын
Thanks & Noted.
@jebarex24
@jebarex24 3 жыл бұрын
in Etabs same span same size column Unbraced length ratio will change y ?
@mumtazali2845
@mumtazali2845 3 жыл бұрын
Sir kindly start Rcc design in Urdu this is a humble request. Please 🙏
@bhawalsports
@bhawalsports 3 жыл бұрын
It’s a Bangladeshi channel
@skillhnter1303
@skillhnter1303 Жыл бұрын
can we ignore it because its only on top most floor?
@Decodebd
@Decodebd Жыл бұрын
We can not ignore.
@sothattheng8624
@sothattheng8624 3 жыл бұрын
It's also in Autodesk Robot too?
@Decodebd
@Decodebd 3 жыл бұрын
Yes.
@sarworhossain1865
@sarworhossain1865 2 жыл бұрын
তাহলে কি UPPER STORY rebar percentage নিবো?
@surferrosa7285
@surferrosa7285 Жыл бұрын
You can't ever design for there being no moment even if everything is perfectly symmetrical. The dead load will cancel itself out on either side but you still need to account for a ULS variable load on one side that is not on the other which would induce a moment.
@shivashrestha1061
@shivashrestha1061 6 ай бұрын
Thanks for the video. But please don’t use that hand animation, its just annoying, as it interrupts the flow of reading
@niinuetey9878
@niinuetey9878 3 жыл бұрын
A GRAPHIC DEPICTION WOULD HAVE HELPED!!!
Difference Between Shell Thick, Shell Thin & Membrane
10:04
DECODE BD
Рет қаралды 29 М.
IL'HAN - Qalqam | Official Music Video
03:17
Ilhan Ihsanov
Рет қаралды 700 М.
VIP ACCESS
00:47
Natan por Aí
Рет қаралды 30 МЛН
Леон киллер и Оля Полякова 😹
00:42
Канал Смеха
Рет қаралды 4,7 МЛН
It works #beatbox #tiktok
00:34
BeatboxJCOP
Рет қаралды 41 МЛН
Structural Shapes Ranked and Reviewed - Which one Wins?
15:34
The Engineering Hub
Рет қаралды 720 М.
Etabs 2015 Tutorial 5 - Reinforcement Detailing of Beams and Columns
13:03
Civilknowhow Tutorials
Рет қаралды 169 М.
How to Design RC Structure on ETABS? Calculate Number and Diameter of Reinforcing Bars
22:47
The Efficient Civil Engineer (by Dr. S. El-Gamal)
Рет қаралды 21 М.
LOAD TAKEDOWNS IN RC COLUMN DESIGN
30:04
BROMTECH ENGINEERING
Рет қаралды 4,5 М.
Building Construction Process | step by step | with Rebar placement
6:15
Isolated Column Footing
6:05
AK Skills & Solutions
Рет қаралды 582 М.
How Engineers Design Buildings: What Structural Engineers Actually Do
7:27
IL'HAN - Qalqam | Official Music Video
03:17
Ilhan Ihsanov
Рет қаралды 700 М.