Blades for the Worlds Biggest Windmill Vestas V236-15 MW & Siemens SG 14-236 DD Being Transported

  Рет қаралды 219,344

iOWNaFERGUSON

iOWNaFERGUSON

Жыл бұрын

Subscribe - bit.ly/2wz56Og
Facebook (Danish) - bit.ly/3b8peWu
Instagram: bit.ly/3bvVkuT
Snapchat: bit.ly/342LPB7
All videos on this channel are copyright and Content ID Protected, which means no re-use or re-upload is allowed. For business inquiries please contact us by e-mail.

Пікірлер: 96
@aarone9000
@aarone9000 11 ай бұрын
I watched a train with blades & bodies on flatbeds go by. The took up the entire length of the train beds! And I thought they were large!
@VB-bo5kz
@VB-bo5kz Жыл бұрын
I need the patience of the truck driver in my life
@xiv3r
@xiv3r Жыл бұрын
insane turbine blade
@fatimasombra
@fatimasombra Жыл бұрын
Meu esposo é motorista dessas carretas que transportam essas pás, aqui no Brasil.
@ArtfromBerwyn-cw5op
@ArtfromBerwyn-cw5op 7 күн бұрын
That is one big blade. That's because it is a blade that is much bigger than the other blades that are smaller because this blade makes them seem smaller relative to this blades size that is much bigger in size than they are.
@leonvann7109
@leonvann7109 Жыл бұрын
What is the unit that's moving the blade with out a truck? Is it an electric cart by a generator?
@mpaul4584
@mpaul4584 Жыл бұрын
What happens to them at end of life?
@lavafree
@lavafree Жыл бұрын
Starts with land and ends with fill
@windkraftfan_sh
@windkraftfan_sh Жыл бұрын
they are crushed into materials for cement
@thomasgade226
@thomasgade226 Жыл бұрын
@4min, you can just see the corner of a WW2 bunker in Hanstholm
@kriscalverley2131
@kriscalverley2131 Жыл бұрын
I seen it. Thank you for pointing that out.
@flytwin1772
@flytwin1772 Жыл бұрын
The weight would be really interesting, it´s depending of material for sure, guess they will use Kevlar as well. At least ~35 tons one blade, which is not much then.
@celalmutlu45
@celalmutlu45 Жыл бұрын
Glass fiber and carbon fiber using for blade manufacturing.
@windturbinemanfr
@windturbinemanfr Жыл бұрын
vestas v236 yay
@vincentrobinette1507
@vincentrobinette1507 Жыл бұрын
These are off-shore scale turbine blades...Are they building these turbines on land? If so, that would be a world record!
@kristianvongos7237
@kristianvongos7237 Жыл бұрын
Nice filming. Did you ask what the blades weight? What they were made of? If they were made in Denmark?
@ninus17
@ninus17 Жыл бұрын
Probably fibreglass or some other composite
@jensstergard9380
@jensstergard9380 Жыл бұрын
Including the vehicles the weight of the Vestas transport is about 180 tonnes. The outside of the wings must be glass fiber. Vestas is primarily situated in Western Jutland, mostly in Lem. Found on Vestas homepage: "At Vestas’ factory in Nakskov, Denmark, specialists are developing the blades for the V236-15.0 MW™ prototype using the mold which was built at the factory in Lem, Denmark." The nacelles are made at the former Maersk shipyard 'Lindø', Northeast of Odense.
@povlnordahl1974
@povlnordahl1974 Жыл бұрын
@@ninus17 Blades are build at the Westas blade faktory, located in Nakskov, Lolland iland, Denmark.
@pmemontage
@pmemontage Жыл бұрын
@@jensstergard9380 haha! Familiar place at Lemm. Damn.... when I was working at Vestas and Totalwind we did maintanance up to the brand new V90. And still some V 27/ 29. V39 lots of V47 and V52. Some V66, ( RCC and VCS ) ( 1.65 and 1.75) Some first V80. And V902MW
@procter98
@procter98 Жыл бұрын
1 month
@JL-rx6hl
@JL-rx6hl Жыл бұрын
At least the driver of the first one got a nice dry warm cab.....
@Coltnz1
@Coltnz1 Жыл бұрын
How many years does it have to run to cancel out the carbon footprint of its manufacture, transport to site and installation?
@SkullRaven
@SkullRaven Жыл бұрын
Turbine manufacturer Vestas studied the carbon payback period for various turbines. This took into account extraction and manufacturing of raw materials, production of the turbines, their transport, erection, operation, maintenance, dismantling and disposal, and the same for their foundation and the transmission grid. The figure was between seven and nine months, depending on the type of turbine. Other analyses have come up with similar figures.
@aarone9000
@aarone9000 11 ай бұрын
You are just a half-empty kind of person aren't you?!
@derekness7900
@derekness7900 Жыл бұрын
They are made from glass and carbon fibre and epoxy resin
@vplph
@vplph 8 ай бұрын
That is a lot of wheels for a blade that is maybe 16 ton a piece? 😅
@Outside85
@Outside85 Жыл бұрын
Curious, the Vestas blade is almost rigid, but the Siemens bends under its own weight? Also it really does seem like a happy coincidence that blades from different companies have to go up the same road at the same time... also whatever Siemens is using to move theirs; good grief it is noisy... Edit: also pity the driver of that thing, exposed to the weather and all...
@mjasenn
@mjasenn 11 ай бұрын
And this comment is why you're in charge of watching KZbin videos showcasing the transportation of component for offshore wind generation units and not the actual transportation.
@anderspedersen7488
@anderspedersen7488 Ай бұрын
The blades are headed to the National Test Center for Large Windmills at Østerild abt. 20 km east of the port of Hanstholm, Denmark. That’s why you have 2 different manufacturers going the same way.
@fabionunesferreiradasilva5641
@fabionunesferreiradasilva5641 Жыл бұрын
👏👏👏👏
@kriscalverley2131
@kriscalverley2131 Жыл бұрын
I was expecting an electric truck pulling it? Does anybody know how black tires burn? Does anybody know how tires are disposed of? But must be environmentally freindly cause they grow on trees? Oh isnt highway full of hydrocarbons. Back to gravel for electric cars
@nicks4934
@nicks4934 Жыл бұрын
Should make £3,000,000 per year for say 25 yrs. So £75,000,000. £80 per MWh in UK. Load factor 30%
@montiro8999
@montiro8999 Жыл бұрын
Load factor is much higher in Uk some turbines push up to 60 percent on the Shetland islands
@vgstb
@vgstb Ай бұрын
Load factor for Vestas V236-15 MW is validated at 63.5% in nominal North Sea operation. Lifetime before overhaul is 30 years, as published in the life cycle assessment of the turbine.
@cerolvideostruck6750
@cerolvideostruck6750 Жыл бұрын
tá porra essa é grande grande asa
@asadalibhuttaasadalibhutta8821
@asadalibhuttaasadalibhutta8821 Жыл бұрын
Blades size?
@jonjak80
@jonjak80 Жыл бұрын
115 meters long
@fajarreza1
@fajarreza1 Жыл бұрын
on peak wind, each of it could supercharge 20 teslas
@jimwoods9551
@jimwoods9551 Жыл бұрын
15Mw would vapourise 20 Teslas, not so good with the maths, Fajar?
@fajarreza1
@fajarreza1 Жыл бұрын
@@jimwoods9551 each blade
@timothyi6492
@timothyi6492 Жыл бұрын
250kW per car means 60, or about 180 per hour.
@thomasgade226
@thomasgade226 Жыл бұрын
Distance is only 25 km, should be electric trucks.
@user-bt9xd7ix3p
@user-bt9xd7ix3p Жыл бұрын
очень скоро люди очнутся от етой грандомании и поймут що их обдуривали и грабили свои и чужие правительства ....
@windkraftfan_sh
@windkraftfan_sh Жыл бұрын
blah blah blah i am a putin controlled puppet
@12345633631
@12345633631 Жыл бұрын
And people still believe our energy needs can be met using windmills 🙄 .. what a joke
@srh2301
@srh2301 Жыл бұрын
Why? Stewart watching a car from a bakery driving by: "And people still believe they can be fed with bread. ... what a joke"
@PistonAvatarGuy
@PistonAvatarGuy Жыл бұрын
@@srh2301 The wind doesn't blow 24/7/365.
@ro30
@ro30 Жыл бұрын
You're right
@SkullRaven
@SkullRaven Жыл бұрын
Wind power is the most efficient technology to produce energy in a safe and environmentally sustainable manner, it is zero emissions, local, inexhaustible, competitive and it creates wealth and jobs. You're the joke.
@SkullRaven
@SkullRaven Жыл бұрын
@@PistonAvatarGuy So what? We also don't have an unlimited supply of oil, gas, coal, nuclear material, sunshine or water.
@LeonardCooperman
@LeonardCooperman Жыл бұрын
It took more energy to make this than it will ever produce..
@nicks4934
@nicks4934 Жыл бұрын
Source?
@ro30
@ro30 Жыл бұрын
You're right
@windkraftfan_sh
@windkraftfan_sh Жыл бұрын
Nah that's wrong.
@SkullRaven
@SkullRaven Жыл бұрын
Turbine manufacturer Vestas studied the carbon payback period for various turbines. This took into account extraction and manufacturing of raw materials, production of the turbines, their transport, erection, operation, maintenance, dismantling and disposal, and the same for their foundation and the transmission grid. The figure was between seven and nine months, depending on the type of turbine. Other analyses have come up with similar figures.
@ulven6668
@ulven6668 Жыл бұрын
Thats a pretty stupid assumption, wind-industry would have been shut down years ago if this was the case
@dougwilliams8602
@dougwilliams8602 Жыл бұрын
Only electric needs and that alone. Nothing more. Certainly not energy
@knutarneaakra6013
@knutarneaakra6013 Жыл бұрын
Microplast spreaders
@akyhne
@akyhne 3 ай бұрын
Except there's no plastic in wind turbines....
@iainw5081
@iainw5081 Ай бұрын
Another waste of resources.
@jimrichards3916
@jimrichards3916 Жыл бұрын
What a waste of money!
@nicks4934
@nicks4934 Жыл бұрын
Like gas?
@SkullRaven
@SkullRaven Жыл бұрын
Wind power is the most efficient technology to produce energy in a safe and environmentally sustainable manner, it is zero emissions, local, inexhaustible, competitive and it creates wealth and jobs.
@arvbergstedt3303
@arvbergstedt3303 Жыл бұрын
The bigger they are. The harder they fall. When a fast wind comes along.
@andersschrder4446
@andersschrder4446 Жыл бұрын
Yeah, I'm pretty sure that noone at Vestas has ever thought of that. They're, like, complete novices in this field.
@johannestrjmer7496
@johannestrjmer7496 Жыл бұрын
Ooh yea... Powerful wind gusts.. Why didn't Vestas thought of this.. 🤔🙄
@claesmansson9070
@claesmansson9070 Жыл бұрын
I think they do now,think they turned around and now trying to figure out something to do about wind problemos?
@claesmansson9070
@claesmansson9070 Жыл бұрын
Looks like a blue whale with open mouth from certain perspectives?
@pmemontage
@pmemontage Жыл бұрын
Nope, when you own one, the money blows straight into your pocket
@burgerbewegunghautnah1955
@burgerbewegunghautnah1955 Жыл бұрын
🤮
@jim73challenger
@jim73challenger Жыл бұрын
Seriously? A windmill?
@pmemontage
@pmemontage Жыл бұрын
Uhh, jup. Bigger part of renewable energy asks for a bit better kind of machine.... This is for the prototype. Serveral sets of this blade has been already smashed in stress test factory. Thats why the blades of this energy mushroom now go to field test. And probably direct on the testfield certified for stress, endurance and most important real sound and background noise.
@SkullRaven
@SkullRaven Жыл бұрын
Wind Turbine*
@asadalibhuttaasadalibhutta8821
@asadalibhuttaasadalibhutta8821 Жыл бұрын
Blades size?
@zeratultc
@zeratultc Жыл бұрын
around 115 meters
@maximedessertenne9336
@maximedessertenne9336 Жыл бұрын
For 236 it’s approximately the half because when we talk about 236 it’s from one edge of the blade from the other edge
@MM-zb1uj
@MM-zb1uj Жыл бұрын
from Denmark-115,5 m long blades mill 256 m high can support 25.000 households, ppr year....😄💪Made in Denmark......
@asadalibhuttaasadalibhutta8821
@asadalibhuttaasadalibhutta8821 Жыл бұрын
@@MM-zb1uj thanks
@Coltnz1
@Coltnz1 Жыл бұрын
@@MM-zb1uj But not when the wind doesn’t blow.
OVERSIZE TRANSPORT!#1 Transporting 58 meter long windmill blades!
14:53
The Joker saves Harley Quinn from drowning!#joker  #shorts
00:34
Untitled Joker
Рет қаралды 55 МЛН
WHO CAN RUN FASTER?
00:23
Zhong
Рет қаралды 36 МЛН
Harley Quinn lost the Joker forever!!!#Harley Quinn #joker
00:19
Harley Quinn with the Joker
Рет қаралды 25 МЛН
EVOLUTION OF ICE CREAM 😱 #shorts
00:11
Savage Vlogs
Рет қаралды 14 МЛН
When A Gang Leader Confronted Muhammad Ali
11:43
Boxing After Dark
Рет қаралды 7 МЛН
TGV speed record 574,8 km/h
9:20
Sándor Csaba
Рет қаралды 50 МЛН
Research rotor blade production at Fraunhofer IWES
3:35
Fraunhofer IWES
Рет қаралды 55 М.
Heavy Haulage of Giant Tank Gone Wrong!
8:30
HD1080ide
Рет қаралды 18 МЛН
Nooteboom Super Wing Carrier - Transporting a 57.5 blade - by McFadyens
2:56
How Wind Turbines Are Built
8:01
Tech Vision
Рет қаралды 103 М.
[HD] Greatest Hollywood Car Chase of All Time - Bullitt (1968)
10:19
VESTAS V90 105 m. H.H. KEFALONIA
17:05
HERMES HEAVYLIFT
Рет қаралды 48 М.
Vestas Wind Turbine Blade transportation
2:51
Vestas
Рет қаралды 562 М.
تعطلت دراجتي بسبب هذا المشاغب😵‍💫🥴
0:28
Cool Tool SHORTS Arabic
Рет қаралды 13 МЛН
Когда с детства ты, и экскаватор вместе.
0:32
MEHANIZATOR FROM STROIBAT
Рет қаралды 1,7 МЛН
Мама забыла меня в багажнике Теслы
0:31
Даша Боровик
Рет қаралды 1,3 МЛН
Manual installation process of highway guardrail
0:15
mianxiwei
Рет қаралды 106 МЛН