The total build time for the Building itself was 2.5 days although one of the days was a really long one.. so probably 3 days of work total. plus the concrete pour was separate. overall time with concrete and everything from signing the papers to final inspection was about 6 or 7 months
@Edmond182111 ай бұрын
What was the total cost of this built, concrete slab, metal building and labor ? Can you list separately. Thanks.
@inkandpistons11 ай бұрын
Check out the other video. I go into all the costs towards the end. kzbin.info/www/bejne/n5y9f51_mcykadU
@SegoMan11 ай бұрын
Nice project, now put another building twice that size out back for storage lol
@inkandpistons11 ай бұрын
Haha, let's just say I may build a little add on "lean-to" soon ..