Appreciate the model and the condensed satellite updates. Seeing some of the shooflies and realignments done will be major for the authority being able to have more of the alignment waiting for rails, and moving the trench forward. Hanford's made a lot of good progress!
@rwdavidoff4 ай бұрын
Jason Dronin Around's channel has a video with nice imagery from about July 20/21 showing the full length of the viaduct in a basically uncut five minute pan, with pause to orbit over the railroad crossing section to see the column work and the work over SR198 preparing the deck forms for future rebar placement.
@AmpereBEEP4 ай бұрын
Absolutely. Each step forward, no matter how small they seem, is adding toward the huge final goal of opening EOY 2030.
@sdsd41394 ай бұрын
Thanks for everything you do to keep us informed! Between closures for harvest season, closures for Christmas freight traffic, and closures for weather, it seems like CAHSR hardly has any days they're allowed to work.
@daniellewis17894 ай бұрын
I knew there was progress but it's always nice to get talked through everything. Thanks!
@TohaBgood24 ай бұрын
I see AmpereBEEP video, I click! LFG!
@SoCalHighIron4 ай бұрын
Babe, wake up! AmpereBEEP just posted CAHSR.
@StefanWithTrains4 ай бұрын
It's great to see this progress on CHSR. I can't wait for you guys to get some HSR.
@TheRailwayDrone4 ай бұрын
Thanks for the clarification irt Grangeville. I was wondering how that crossing would work.
@CokeKing-mq9jg4 ай бұрын
What map you used to see updated map compare to older one?
@AmpereBEEP4 ай бұрын
I use EOS Landviewer for my A/B comparisons.
@DraecDragon4 ай бұрын
train proot best proot
@spencerjoplin28854 ай бұрын
The model on flat imagery makes the Hanford Viaduct look even more like a giant structure in the middle of nowhere.
@AmpereBEEP4 ай бұрын
In real life, the orchards around it are about as tall as the viaduct itself, but for obvious reasons I left those out of the model.
@pirazel78584 ай бұрын
I don't think that any signalling will be installed. It will most likely be ETCS Level 2 SRS 4.0.0 without lineside signals
@DavidCiani4 ай бұрын
There's still trackside equipment that's part of the signaling system, even when the actual signals are communicated to the driver in-cab.
@pirazel78584 ай бұрын
@@DavidCiani New ETCS high speed only lines are build without signals to reduce costs and potential points of failure. With the latest tracks, which require monitored train integration, even having no axle counters. The only track side equipment are the OCS, connection to the switches, balise, and occasional a radio block centre
@pieter-bashoogsteen22833 ай бұрын
Didn’t know that you made your own videos now after Dronezone flyovers channel was hacked.
@AmpereBEEP3 ай бұрын
I have! Unfortunately my videos are paused for the time being to focus on school, but hopefully come late December I will be posting again!
@pieter-bashoogsteen22833 ай бұрын
@@AmpereBEEP You studying to become a civil engineer by any chance?
@AmpereBEEP3 ай бұрын
@@pieter-bashoogsteen2283 I previously was, but switched majors to Geography in order to focus more closely on Urban/Transportation Planning about 2 years ago.
@pieter-bashoogsteen22833 ай бұрын
@@AmpereBEEP so urban and transit planning?
@jasondroninaround3 ай бұрын
I don't know if you allow links in your comments but click on my name if you're looking for up to date drone footage in the Hanford Viaduct area. I like and subscribed. I like the method you use for showing the updates :-)