Cementing calculations

  Рет қаралды 9,296

Petroleum and chemical engineering channel

Petroleum and chemical engineering channel

2 жыл бұрын

Fluid catalytic cracking-1 link : • Fluid catalytic cracki...
Petroleum Refining Technology-1 : • Petroleum refining tec...
Drill bits-Roller cone bit • Drill bit- Roller con...
Rotary drilling rig components-1
Reservoir simulation- • Lecture- Reservoir sim...
Petroleum Refining Technology-2 • Petroleum refining tec...
Cementing of wellbore is one of the most critical operation in the drilling and completion of oil and gas wells. The most important function of Oil & Gas well cementing is to isolate the various zones within wellbore, provide adequate support for casing, and prevent any fluids to migrate.
Cementing Calculations:
Total sack of cement is in sack. Total volume of cement is gallon. Yield of cement is gal/sack. Total sack of cement = 6300 ÷ 11.257 = 560 sacks
The ratio for a basic concrete slurry mix is 1 or 2 parts Portland cement to 1 part water. Start with equal parts cement and water, and then add more cement until you have the desired consistency.
Cementing materials may be siliceous or calcareous. Calcium carbonate and silica are the major constituents of cementing materials. Other constituents are quartz, feldspar, calcite, clay, iron oxide, calcium oxide, copper sulphate, manganese, aluminum, and sulphur.
A component installed near the bottom of the casing string on which cement plugs land during the primary cementing operation. It typically consists of a short length of casing fitted with a check valve.
In oil well-cementing operations, ordinary Portland cement (API standard) is mixed with water
and other additives such as dispersant, fluid loss additives, and friction loss additives to form cement
slurry. The so-formed slurry is pumped downhole around the casing in an oil well. The cement
sheath formed around the casing serves various functions such as supporting the weight of casing
string, isolation of various zones around the casing and preventing the casing from oxidation. Often,
cracks are developed in the cement sheath owing to shrinkage, de-bonding of the cement sheath
from the casing or well-bore.

Пікірлер: 1
@medidirajasekhar7037
@medidirajasekhar7037 Жыл бұрын
Wonderful video dear Prof. Bala Chandran sir
Casing cementing calculations 7 steps
23:36
Petroleum and chemical engineering channel
Рет қаралды 1,4 М.
Liner Setting & Cementing
21:48
Carlos Oliver
Рет қаралды 117 М.
Looks realistic #tiktok
00:22
Анастасия Тарасова
Рет қаралды 105 МЛН
Now THIS is entertainment! 🤣
00:59
America's Got Talent
Рет қаралды 39 МЛН
Demystifying Oilfield Cementing Calculations: A Comprehensive Guide
6:13
Petroleum Fundamental
Рет қаралды 5 М.
How Do You Steer a Drill Below The Earth?
14:53
Practical Engineering
Рет қаралды 4,1 МЛН
Petrel volume calculation
12:22
Petroleum and chemical engineering channel
Рет қаралды 1,2 М.
wellhead instillation.wmv
9:00
Oil and Gas
Рет қаралды 487 М.
Liner Hanger from Baker Hughes
9:43
Petroleum Today Magazine
Рет қаралды 150 М.
Why Railroads Don't Need Expansion Joints
15:53
Practical Engineering
Рет қаралды 3,3 МЛН
Casing and Cementing
20:31
Hasan
Рет қаралды 186 М.
Common Well Cementing Problems and Solutions
4:21
Pegasus Vertex—A LINQX Company
Рет қаралды 7 М.
WATCH: Overall Cementing Process
4:13
Nine Energy Service
Рет қаралды 126 М.
Life Cycle of Oil & Gas Wells - from Drilling to Completion
6:19
Production Technology
Рет қаралды 656 М.
Looks realistic #tiktok
00:22
Анастасия Тарасова
Рет қаралды 105 МЛН