Chrysler’s Space Shuttle Proposal: the SSTO SERV and MURP

  Рет қаралды 4,092,543

Hazegrayart

Hazegrayart

Күн бұрын

Chrysler Aerospace was already contracted for the Saturn 1 and 1B First Stage so in 1971
they proposed an alternate shuttle program, the SERV and MURP
SERV: the Single-stage Earth-orbital Reusable Vehicle had a 53 metric ton payload in a 7m x 18m payload bay
12 LH2/LOX aerospike engines were arranged around the rim of the base, covered by movable metal shields
Jet Engines, which were fired just prior to touchdown in order to slow the descent
MURP, the Manned Upper-stage Reusable Payload
The MURP was based on the HL-10 lifting body (Six Million Dollar Man test Vehicle) and a Larger Versionone larger (the D-34) could carry up to ten passengers

Пікірлер: 4 000
Saturn Shuttle with Flyback Booster
4:21
Hazegrayart
Рет қаралды 339 М.
Rocket Concept Payload Comparison
5:46
Hazegrayart
Рет қаралды 211 М.
哈莉奎因怎么变骷髅了#小丑 #shorts
00:19
好人小丑
Рет қаралды 54 МЛН
Стойкость Фёдора поразила всех!
00:58
МИНУС БАЛЛ
Рет қаралды 4,8 МЛН
Worst flight ever
00:55
Adam W
Рет қаралды 29 МЛН
Kerbal Space Program but Everything Goes Wrong
5:18
TD Channel
Рет қаралды 82 М.
How did the Space Shuttle launch work?
15:18
Jared Owen
Рет қаралды 10 МЛН
Convair Nexus Reusable SSTO Rocket: Proposed Saturn V Replacement
4:26
1000 Sparklers vs Toilet
10:27
HaerteTest
Рет қаралды 11 МЛН
Model Rocket Battle 3 | Dude Perfect
10:38
Dude Perfect
Рет қаралды 45 МЛН
How Pager Explosive Attack in Lebanon Happened? #israel #hezbollah
10:07
"Riding the Booster" Never Sounded Better
8:32
NASA
Рет қаралды 475 М.
哈莉奎因怎么变骷髅了#小丑 #shorts
00:19
好人小丑
Рет қаралды 54 МЛН