Рет қаралды 83,615
3D Gas Cooling in an acquired structure burn. The room is developed to post flashover and fire attack is launched using an Akron 753 (flow rate 230 lpm). The room was approximately 5 x 4.5 metres. Cavity brick with cement render. Fuel load consisted on a number of old computers and furniture. So the fuel load was quite high.The video show an acquired structure being used as an extension of the class room. We did not want to put the fire out until the learning objectives had been achieved.
Photography by Tim Watkins. Nozzle operator: Shan Raffel