Completion of capital dredging works at Port of Townsville Channel Upgrade

  Рет қаралды 326

HallContractingAus

HallContractingAus

Күн бұрын

Hall's backhoe dredge, Woomera, joined various tugboats in ceremonially marking the last bucket of material dredged as part of the Port of Townsville Channel Upgrade project in March 2024.
Hall removed 3.4 million cubic metres of material from the Platypus Channel and the adjoining Sea Channel, with the works enabling trade, defence and cruise ships up to 300 metres in length to access the Port.

Пікірлер
James May finally drives the Tesla Cybertruck
14:15
James May’s Planet Gin
Рет қаралды 6 МЛН
哈哈大家为了进去也是想尽办法!#火影忍者 #佐助 #家庭
00:33
How Strong is Tin Foil? 💪
00:26
Preston
Рет қаралды 138 МЛН
The Hidden Engineering of Landfills
17:04
Practical Engineering
Рет қаралды 4,5 МЛН
Nui boat harbour civil works, Tuvalu
4:01
HallContractingAus
Рет қаралды 1,8 М.
African Heron - Bulk Carrier - Napier, New Zealand
2:45
Ships and Boats NZ
Рет қаралды 297
Mesabi Miner Arriving for Winter Layup in Sturgeon Bay, WI. With Salute!
4:13
Door County Drone by Mark Evenson ©
Рет қаралды 644 М.
The Abandoned Steam Locomotive left on the side of a Mountain
18:51
Lawrie's Mechanical Marvels
Рет қаралды 97 М.
The North Sea explained
12:49
FactSpark
Рет қаралды 598 М.
How does a Tank work? (M1A2 Abrams)
9:49
Jared Owen
Рет қаралды 55 МЛН
Smart Meter Disaster!!
16:33
Rygol Electrical and Renewables Bristol
Рет қаралды 445 М.