I really appreciate the time and effort you’ve invested into these videos. The textbook is a good resource but the examples are often long and confusing. These videos are simple to understand and digest, I can’t thank you enough.
@khalilduncan21246 жыл бұрын
That's true, it doesn't help when your teacher isn't great either XD
@samarthjajodia94845 жыл бұрын
The good thing is I can watch your videos on mute even. This is called a well-explained tutorial. Thanks. Gratitude.
@ruthtendo67477 жыл бұрын
thanks alot ,i just cant thank you enough.YOUR ACCENT IS JUST PERFECTO.I CAN NOW DO ON MY OWN NUMBERS.I JUST USED NOT TO UNDERSTAND MY LECTURER
@DazHarkz9010 жыл бұрын
B changes from 5 to 7 @ 1:50
@TheElmar999 жыл бұрын
First of all thanks these episodes have helped a lot. As for the first example in this video is the critical path B - F?
@The0gravity1017 жыл бұрын
Is there a video on how to calculate lower bounds?
@demetrasiountris82606 жыл бұрын
Thank you for this video. Very clear and well-presented.
@jeevan65488 жыл бұрын
Can the calculation of the float be done by figuring out the time between the options instead (ie : 13-6, which is 7)?
@mohammadkefah41237 жыл бұрын
7:52 B-Dummy-F does not = 7+7, B(7)+Dummy(0)+F(4) = 11 Great videos tho Thanks :) *****UPDATE***** Sorry i was hasty and confused... should've finished the vid before commenting Keep up the good work