this is not far from where i live love seeing older lines coming back thnx
@jasonervoes132611 ай бұрын
Great video awesome job. My question is Do these freight trains have cabooses?
@SouthCoastRailVideos10 ай бұрын
No
@brianfalzon67392 жыл бұрын
Well done, glad those lines are revived
@daveyboy_ Жыл бұрын
Now that .. that is what railroading is all about
@danmathers1412 жыл бұрын
It was a shame rail lines disappeared so much. Trains can carry so much between cities. Passengers get a more interesting ride when they can see scenery. Have you ever seen an air liner dip down so passengers can see something on the ground?
@allanegleston49312 жыл бұрын
congrats for line re instatement.
@ryangrimm93052 жыл бұрын
Just had some fun comparing/following the map you supply with the GOOGLE MAPS sat view...interesting!
@SouthCoastRailVideos2 жыл бұрын
Glad you liked it!
@charleskermode39632 жыл бұрын
Use to go swimming off that tressle there use to be an old cement company there back in the day
@JamesT_Rustle2 жыл бұрын
Its been in use for a few years.. GU uses that track every week, 2 customers. track gets inspected once a week
@SouthCoastRailVideos2 жыл бұрын
Been in use for one year now. I uploaded this just a few days after the one year anniversary of freight once again traveling along the route.
@OldLordSpeedy2 жыл бұрын
9:52 What be the free space with the many lamps at left and right side?
@SouthCoastRailVideos2 жыл бұрын
Forge Park Train Station. It is actually noted in the video.
@alcopower57102 жыл бұрын
This is so awesome to see 💪
@WHJeffB2 жыл бұрын
Is it normal or everyday practice for the GU to run 2 or 3 MP15's in "push-pull" configuration? Glad to see abandoned track back in service.
@dcrailmedia80542 жыл бұрын
Quite normal, it’s not unheard of them doing it when they have to work Upton, and sometimes when they have to go to Bellingham and Franklin. They have shoved north coming from Bellingham and Franklin in the past but it doesn’t happen often
@mshum5382 жыл бұрын
If you don’t have a runaround track then you have to have an engine on both ends which is comon on short lines….these 1100 engines are ideal for running in either direction…..these are mp’s which are equipped with a road/yard selector switch…..we had the 1170 & 1156 were i worked out of…
@WHJeffB2 жыл бұрын
@@mshum538 I totally get why they do it, makes perfect sense. Just wondered if that was normal operating procedure.
@delcasaleexcavating95082 жыл бұрын
What is a geometry train ?
@tommyp88452 жыл бұрын
Let’s make rail great again.
@jackcurran11222 жыл бұрын
Absolutely all of the rail lines were abandoned in the 50's and 60's in favor of trucks, NOW they can't get drivers and the traffic moves at a snails pace
@shauntakata17622 жыл бұрын
Is that an equipment move?
@happyhome412 жыл бұрын
Love the video, love even more the verbose explanation with links ! Three engines to move one box car ? What's up with that ?
@SouthCoastRailVideos2 жыл бұрын
The current operation requires a locomotive on each end of the train due to track arrangement. They also handled a long train that was dropped off in Upton and Hopedale before continuing to Milford.
@fredaycott52832 жыл бұрын
South Coast Rail, great video. There needs to be a second or third track, in case a textile company or furniture company , sets up business in town. Another thing to look at, Dormant Rail should buy more Switcher locomotives called SW 1500. I can see business, just pick up at full speed, and those switcher locomotives are working over time. Dormant Rail line needs to hire more personnel. That;s what make a great railroad. Personnel and equipment together.
@truckerkevthepaidtourist2 жыл бұрын
So was it the coming of that new business and the fact that there is definitely some rail traffic that decided to make them reactivate that line?
@SouthCoastRailVideos2 жыл бұрын
The G&U wanted to expand to these two customers that were previously served by CSX. There were no new customers but by taking over they could increase traffic and run trains more frequently.
@truckerkevthepaidtourist2 жыл бұрын
@@SouthCoastRailVideos good deal
@VictoryHighway2 жыл бұрын
I live in Hopedale. I occasionally see a G&U train, but not too frequently. A while back, the MBTA ran a non-revenue train via the G&U. Did anyone get a video of it?
@SouthCoastRailVideos2 жыл бұрын
[HD] First train since 1983: MBTA on the Grafton & Upton kzbin.info/www/bejne/Y5-tk5tjaLhkn7c
@VictoryHighway2 жыл бұрын
@@SouthCoastRailVideos Cool! I’m going to have to check that out!
@ChrisMarshallUS2 жыл бұрын
Thanks for sharing, I live a few miles from Bellingham Junction. Out of interest what do you use to get the timetable for trains on these lines? Would love to get some pictures/videos myself one of these days.
@SouthCoastRailVideos2 жыл бұрын
They run as needed
@ernestpassaro96632 жыл бұрын
That's great news
@bobkoure2 жыл бұрын
Why the wig-wag lights at the beginning? I thought that meant some kind of equipment failure(?)
@chickenwing1112 жыл бұрын
I think they use them because they look kinda cool.
@mshum5382 жыл бұрын
@@chickenwing111 Mike, you meaning the “ditch lites” on the bottom of the controller they are required on the leading end ( forward) for operation today for speeds over 20mph…..ms~~~
@kwlanco27142 жыл бұрын
What does Garelick farms, ship in or out? powdered milk outbound.? What is that large facility on the southwest corner of Bellingham Junction (it doesn't have a label on Google maps)? That appears to be the only Bluelink distributor in Southeast, New England. With a 350,000 sq ft. building, seems like they would need a lot of spine cars.
@VictoryHighway2 жыл бұрын
You might be thinking of the BlueLinx facility on Maple St. in Bellingham. It used to be Georgia Pacific.
@VictoryHighway2 жыл бұрын
I think Garelick Farms receives plastic pellets to make milk bottles.
@kwlanco27142 жыл бұрын
@@VictoryHighway I found the Blue link building. But I'm still curious what the large facility at Bellingham junction is?
@kwlanco27142 жыл бұрын
@@VictoryHighway well, that would make sense.
@VictoryHighway2 жыл бұрын
@@kwlanco2714 it’s a power plant.
@chickenwing1112 жыл бұрын
An chance the T will extend service to Milford?
@dcrailmedia80542 жыл бұрын
It’s been talked about for years, they have done studies on expanding to Milford, even Hopedale too. They’re just studies though so we’ll see within the next 10 - 20 years
@VictoryHighway2 жыл бұрын
They’ve been talking about that since the late 1980s. I’d love it, but I’ll believe it when I see it.
@SilhouetteJudas2 жыл бұрын
@@dcrailmedia8054 They were talking about doing it on the Franklin line; adding a station in Milford and Hopedale. I would love that so much. I feel like adding one in Upton would work too.
@dcrailmedia80542 жыл бұрын
@@SilhouetteJudas to be honest it would be cool to see the T in Hopedale on the regular but with the tight curves NIMBYs and grades it would be very hard to see a proper commuter service
@SilhouetteJudas Жыл бұрын
@@dcrailmedia8054 NIMBYism about passenger rail service has to be the dumbest thing ever. “You’re telling me I can take a train that’s located in my city/town to work everyday or see friends and go all over the state?? And that I don’t have to drive as much anymore?? How dare you even suggest that”
@nkeegs2 жыл бұрын
I wonder where they’re picking these cars up ? IBT?
@SouthCoastRailVideos2 жыл бұрын
CSX drops off cars for the G&U at North Grafton, MA