Mumbai Metro Line 5 & Line 12 Progress | Thane - Bhiwandi - Kalyan - Taloja Metro Line

  Рет қаралды 59,033

Droneman

Droneman

Ай бұрын

There are total 14 Metro lines Planned in Mumbai Region. Which is approx. 340 km in length. Where around 46.5 km operational, 156.1 km under construction, 115.8 km in proposal and 21.3 km approved.
In today's video you will see Line-5 and line-12 update, which covers Thane, Bhiwandi, Kalyan, Taloja.
Support Us - droneman@ibl
Support Us by Joining Our Patreon : / droneman
Connect me on -
Twitter - / dronemanyt
Instagram - / dronemanyt
#mumbaimetro
#kalyan
#droneman
Mumbai Metro Line 12
Mumbai Metro Line 5
Mumbai Metro Ground report
Mumbai Metro Drone View

Пікірлер: 129
@sachinnewaskar1000
@sachinnewaskar1000 Ай бұрын
At the endpoint of metro 5 near that road over bridge you almost reached starting point of kalyan goods yard from there you could cover kalyan remodeling project under which 6 new platforms will be constructed to separate suburban traffic from mail express trains trafic. This is very ambitious project of MUTP 3 A of 900 crs
@LeCorbussyeir
@LeCorbussyeir Ай бұрын
You are wrong in your assesment when you say Line 12 will solve traffic problem at Shilphata. Line 12 will not solve any traffic problem. There are very few people who work at Taloja-Panvel region while staying in Ambernath-Kalyan-Dombivli region. Most people staying here work in Mumbai and Navi Mumbai. Line 14 would have been the actual game changer allowing people to go to Ghansoli/Kanjurmar/Andheri directly or with just a few interchanges. For god knows what reason the line 12 was pushed ahead of Line 14. Probably some politician owns chunk of empty farmland through which the Line 12 goes through for which the project was fastracked. To raise their land prices by showing a shiny new metro train going through the fields.
@user-kk8hq4dm8k
@user-kk8hq4dm8k Ай бұрын
Only allah can save you. Kaffirs making metro which is not even halal.
@SshivamKhopkar
@SshivamKhopkar Ай бұрын
That is literally every Metro in Mumbai😂. To solve congestion on roads theycneed to make roads better! Making another mode of transport is not the solution. People barely use the new 2A and 7 metro! Reason is the stations are far away from main localities. Its difficult to reach them. 0 connectivity!
@cheemterastrial9399
@cheemterastrial9399 Ай бұрын
This is literally what everyone wants, line 14, is a major corridor just as important as local trains or freeways in mumbai!
@ameykulk
@ameykulk Ай бұрын
It's okay, take it easy, man! No one can predict anything at the moment!!
@atishamathur9014
@atishamathur9014 Ай бұрын
L
@abdulrahim6544
@abdulrahim6544 Ай бұрын
Worst thing is that kalyan shilphata road widening from 4 lane to 6 lane is still incomplete, This road was already reeling with traffic jams and now half the road is blocked by metro barricades is making is disastrous. One reason is non availability of another road to shilphata. Some days ago a school declared holiday due to traffic jams.
@SydGhosh
@SydGhosh Ай бұрын
Road widening has never and will never solve traffic congestion. Getting people to use modes of transit that aren't cars is the only way.
@Kohinoor-k7578
@Kohinoor-k7578 Ай бұрын
विद्या निकेतन स्कूल
@shatzco
@shatzco Ай бұрын
Super Power India
@ajaysalunkhe1260
@ajaysalunkhe1260 19 күн бұрын
These 2 lines will take so many years to complete till then we kalyan and dombivlikar have to suffer alot
@sanketsapre
@sanketsapre 5 күн бұрын
Believe me , metro 12 from kalyan is useful only till palava, and not much folks will continue to travel for Taloja, most will get down at palava and get the metro line 14 to go towards Kanjurmarg - central railway. And this metro line 14 will take at least 4 years, not a single pillar has been put for it. Overall it is a huge waste of time of the tax payer. Planning could have been a lot better.
@sachinnewaskar1000
@sachinnewaskar1000 Ай бұрын
Please capture progress of kalyan yard remodeling project. Dismantling work of goods tracks already done. Land acquired thru dismantling. Earthwork almost completed.
@rahulpable5541
@rahulpable5541 Ай бұрын
Kalyan terminus project
@anaytodankar8003
@anaytodankar8003 Ай бұрын
Very informative..watching your drone video is more knowledgeable..keep it up!!!
@user-ke6ox3kp4t
@user-ke6ox3kp4t Ай бұрын
Agle 7 sal ke bad phirse aap ko same video banana padega, tab tak bhi pura nahi hoga ye metro
@khirodjena404
@khirodjena404 Ай бұрын
😂😂😂
@hey_Ananyaaa
@hey_Ananyaaa Ай бұрын
Haa na shayad bjp is baar har rhai hai Maharashtra me😢
@shahnawazshaikh399
@shahnawazshaikh399 Ай бұрын
Thane railway station ko master plan k saath redeveloped karna chahiye or fir metro line 5 ko Thane station se start karna chahiye Thane railway station then Bhiwandi ST bus stand then Kalyan railway station or last Mai Kalyan APMC uske baad metro line 12 ko start karna chahiye
@nandugupta9181
@nandugupta9181 Ай бұрын
Jai shree ram 🚩🚩 i am first viewer
@nandugupta9181
@nandugupta9181 Ай бұрын
Thanks droneman bhai❤❤❤
@vasanttari2501
@vasanttari2501 Ай бұрын
Much needed update. Amazing work. 🎉❤
@rajeshvt
@rajeshvt Ай бұрын
Line 12 is majorly running on the Kalyan shil road. Unless there is a connection to the main suburban line , not sure how effective it will be.
@ashketchum9566
@ashketchum9566 Ай бұрын
It should have easy transfers to Navi mumbai metro and Kalyan station on each end, so i personally don't believe effectiveness is a big issue, especially because mumbaikars have no apprehension about transfers
@mukpat001
@mukpat001 Ай бұрын
Metro always connects subarea between two major stations. It connects the sub-area between Kalyan and Thane. There are 17 stations between them.
@rajeshvt
@rajeshvt Ай бұрын
Check the 17 stations😊
@sanketsapre
@sanketsapre 5 күн бұрын
Line 12 should have covered some insides of Dombivli East, it is passing so much from the outer parts and skipping Dombivli, so sad for Dombivlikars , they contribute to so much tax as most population is literate and job going, they just have option of central railway. Basically no metro for Dombivli.
@ketankeni7116
@ketankeni7116 Ай бұрын
Nice shot amazing view nice one 👏👏👌👍☺️
@27_yashnimkar45
@27_yashnimkar45 Ай бұрын
This channel is a goldmine
@MRTSRRTS
@MRTSRRTS Ай бұрын
Very big progress. Congratulations for this construction .. Go Mumbai 💪💪💪💪
@Mohdsayeed82
@Mohdsayeed82 Ай бұрын
Sir metro line 14 kanjurmarg to badlapur ka update dijiye jara
@anikaitgupta5569
@anikaitgupta5569 Ай бұрын
Uska kuch kam shuru nhi hua
@PIG_ALLAh
@PIG_ALLAh Ай бұрын
Entire Mumbai look like Slum😢
@Yogeshwar_Dalvi
@Yogeshwar_Dalvi Ай бұрын
Navi Mumbai Metro is also operational. Slow and gradually public is opting metro compared to buses.
@chempranav
@chempranav Ай бұрын
I dont approve the 2nd phase, it wont solve any current traffic issues, should have covered Dombivli prime area. Thane Bhiwandi rapid transport was much needed & it will be to Bhiwandi commuters.
@satishkumarnair9781
@satishkumarnair9781 Ай бұрын
It is very useful to have a drone vedio to know the areas and how the metro can be useful to those areas . Keep it up. Hope to see other metro projects and the Navi Mumbai Airport also.
@aryanpatil1852
@aryanpatil1852 Ай бұрын
@Droneman whenever you shoot Virar-Dhanu Quadrupling video please also cover what work is in progress at Virar station and it's progress. Love your videos 🤩
@amit2992
@amit2992 Ай бұрын
Pls show line 12 allignment by Drone. Also, if you can get hold of the stations GPS coordinates. The DPR available online is old one and may not have the latest poistions. You could try to reach out to Palava City and Runwal for funding your videos of this section as it will benefit them.
@RSam9579
@RSam9579 Ай бұрын
Beautiful drone shots with excellent to the point narration. Bhai please Mumbai ke saari under construction lines ka update do one by one in every 3 months if possible. 👍Keep it up the good work!!!
@abhinavkokate8018
@abhinavkokate8018 Ай бұрын
Pune metro line 3 Hinjewadi - Civil court update please 😊
@shardulpawar1277
@shardulpawar1277 Ай бұрын
Good job drone man
@SumitSThakur2105
@SumitSThakur2105 2 күн бұрын
Why Navi Metro work not starting for phase 2 and phase 3??
@omkar2810sarvajanik
@omkar2810sarvajanik Ай бұрын
also continue line 9 AND LINE 4 TOO MUCH UPDATE HAS BEEN DONE THERE WITHIN 10 MONTHS
@yamendragadge123
@yamendragadge123 26 күн бұрын
nice one
@samiullashaikh427
@samiullashaikh427 Ай бұрын
Metro travelling from Kalyan to Taloja will not effect traffic problem it will be same .....
@lalitupadhyay777
@lalitupadhyay777 Ай бұрын
Will they start operations from kapurbawdi to bhiwandi before entire project is completed as kalyan phase will tale much time but uptil Bhiwandi fundamental structure is almost done
@liveenjoy6821
@liveenjoy6821 Ай бұрын
how will they start when depot has not even started constructing?
@nayansaikia7569
@nayansaikia7569 Ай бұрын
appreciate your efforts
@nadeemahmadazmi6950
@nadeemahmadazmi6950 Ай бұрын
Construction of phase 2 of metro 5 is yet to commence.. Phase 1 of same is under construction
@shubhankitdhir
@shubhankitdhir Ай бұрын
Brother do you live in Taloja ?
@Akshay03186
@Akshay03186 Ай бұрын
Plz do capture other city projects also, bas hogya mumbai pune. Maharashtra mai aur bi jagah projects chlu pls do cover that
@aftabalikhan8900
@aftabalikhan8900 Ай бұрын
Bhiwandi metro jaldi se jaldi chalo hona chahiye
@maxwellgirase
@maxwellgirase Ай бұрын
Thank you sir
@vishanvasudevan7472
@vishanvasudevan7472 Ай бұрын
@droneman please do mention the project's estimated period or timeline projected, this will help us to understand how work is progressed.
@sourabhkedare672
@sourabhkedare672 Ай бұрын
Line 5 phase 2, is it going to be underground or elevated
@hsreyas
@hsreyas Ай бұрын
Why are delaying this idk we have seen same update over the last 3 years. It's the same from the last update. Atleast they should start till bhiwandi much more decongestion will happen.
@arinavasthi5087
@arinavasthi5087 Ай бұрын
Pls cover line 9 too
@nileshtambe998
@nileshtambe998 Ай бұрын
Bro can you please also make video for Pune metro line 3, I know many IT workers including me are eager to know about it.
@shubhampawara781
@shubhampawara781 Ай бұрын
i think line takes more than 5 years ro complete
@akshithtalks179
@akshithtalks179 Ай бұрын
Metro 5 work is going in snail speed idk when it will complete phase 2 is halt from 5yrs
@rupeshanarock
@rupeshanarock Ай бұрын
Hello @droneman, can you cover Mumbai Metro Line 4 progess and Maharashtra Amravati Airport progress. Please.
@parvezshaikh6463
@parvezshaikh6463 Ай бұрын
Line 12 se palava phase 2 ka fayda aur price badega
@nikhilmane4125
@nikhilmane4125 Ай бұрын
Navi Mumbai metro line 2 taloja to khandeshwar par video banao
@shettysandarsh
@shettysandarsh Ай бұрын
Please cover Bengaluru metro project too ..
@omkar2810sarvajanik
@omkar2810sarvajanik Ай бұрын
NO HERE ONLY MUMBAI WORK NOT OUTSIDE MUMBAI THIS CHANNEL IS FOR MUMBAIKARS
@tejaspune
@tejaspune Ай бұрын
Kindly cover Pune metro as well Line 1 2 and 3
@atishamathur9014
@atishamathur9014 Ай бұрын
Ye kb complete hogi?
@hrishidunde5983
@hrishidunde5983 Ай бұрын
What about Metro Line -14
@PRATHMH
@PRATHMH Ай бұрын
This project will take ages to finish. Development speed in KDMC region is very very slow. May be in 2030 this line may get operational fully. Mankholi bridge, Palava junction flyover to name few which are in development since ages but still see no light when they will be open to use.
@Ghostfreak_NB
@Ghostfreak_NB Ай бұрын
Exactly
@Alfa210A
@Alfa210A Ай бұрын
Tom fox music right
@maxwellgirase
@maxwellgirase Ай бұрын
Bhai mere ghar pass nahi aye aap thoda sa or age ate to manpada sarkal pe ate to acha lagata❤
@DilkeKareeb
@DilkeKareeb Ай бұрын
Hope line 13 purple work starts soon.
@abhishekyadav1872
@abhishekyadav1872 Ай бұрын
Uddhav thakre government built 500 km Maharashtra Samriddhi Rashtriya Rajmarg Expressway. Isme kabhi uski bhi tarif kardo bhai. 2019 to 2022 rapid growth and Innaugration in 2022 by PM Modi.
@Billu.Badmosh.5
@Billu.Badmosh.5 Ай бұрын
Ussne nahi banya vo Devendra Fadnavis ka Project tha vo uss project ke liye funding or clearance se leakar land acquire karne tak sab kam Devendra fandnavis ne kiya he tabhi or expressway kam mojorty DF ke samya hi hua he ..😂
@VRSALES-is9pe
@VRSALES-is9pe Ай бұрын
Kuch bhi bolega bhai. Thoda knowledge badhavo
@VRSALES-is9pe
@VRSALES-is9pe Ай бұрын
​@@Billu.Badmosh.5right bhai. He is infra man.
@indiangaming2520
@indiangaming2520 Ай бұрын
Please make video on pune metro
@MAX__GAMING691
@MAX__GAMING691 Ай бұрын
Air mumbai meyro line ki video banao sir ji ❤
@nikhilswami2382
@nikhilswami2382 20 күн бұрын
Kalyan ring road update please
@abhishekcpadwal1989
@abhishekcpadwal1989 Ай бұрын
This route shall help people from Shilphata to reach Thane and beyond via metro instead of relying solely on central railway!
@ManojSingh-n8d
@ManojSingh-n8d Ай бұрын
Merto5 will now connect to ulhasnagar new update
@unboxingmania5382
@unboxingmania5382 Ай бұрын
Are currently working at L&T or you left the job please answer ????
@swatikarekar2872
@swatikarekar2872 Ай бұрын
Please cover the metro line 13
@newbie8051
@newbie8051 Ай бұрын
Line 12 they have started pile testing and load testing, so it it'll take 3years of construction at least. Haven't finalized on the metro rakes as well, so we could see delays similar to that of Bangalore Yellow Line lol This line opening in 2027 seems unrealistic for a project in MMR, especially as this Line does not pass through any politically/financially rich areas. Yes this will connect a lot of users, but not a lot of commercial spaces are available within this stretch, giving this the same priority as Navi Mumbai Metro Line -1, which was well to be put it softly, neglected.
@Facts-Factory23
@Facts-Factory23 Ай бұрын
Make video on metro line 2b
@sagargawade6701
@sagargawade6701 Ай бұрын
Can u try to nake video on navi Mumbai metro phase 2 status
@dronemanYT
@dronemanYT Ай бұрын
Okay
@PlasmodiumV
@PlasmodiumV Ай бұрын
Seems like road markings are considered as Gustakh-E-Rasul / Beadabi by Indian authorities & general population. They avoid it with utmost diligence.
@amitmane1409
@amitmane1409 Ай бұрын
घोडबंदर रोड metro update batavo
@cts4044
@cts4044 Ай бұрын
0:34 Isko widen kar sakte hain. Iss shot mein jo ilaka dikhaya hain uss mein se saari illegal construction ko hata do! 😏🤓 Simples.
@shaileshborkar6638
@shaileshborkar6638 Ай бұрын
प्रोग्रेस देख के लगता नही ये अगले 5 साल के अंदर होगा
@bhushankvlogs11
@bhushankvlogs11 Ай бұрын
will take 10 years to complete
@adway1448
@adway1448 11 күн бұрын
should have been a double decker bridge for cars and metro for Kalyan shilphata route. The traffic is horrible and is going to get worse. Metro will be useless.
@amishD69
@amishD69 Ай бұрын
This Metro line seems to be made especially for Lodha Palava and Lake Shore projects, no respite to Dombivlikars
@akash_c
@akash_c Ай бұрын
Titwala Ringroad Update
@88deepu8888
@88deepu8888 Ай бұрын
अरे भाई कहना क्या चाहते हो
@sumitgpatil
@sumitgpatil Ай бұрын
Don't put Unnecessary AFX, they are annoying...
@kirangawari6320
@kirangawari6320 Ай бұрын
Meet up kr bhai
@sandeshkoli9835
@sandeshkoli9835 Ай бұрын
Complete in 2030
@santoshtaral4160
@santoshtaral4160 Ай бұрын
Kalyan ring road
@kamartaj3010
@kamartaj3010 Ай бұрын
Or 15 saal lagega isko banne me
@paraghule9096
@paraghule9096 Ай бұрын
Bhivandi aur Dombivali me to jagaha hi nahii, kyaa khaak metro banegi, ye plan scrap me jaane waalaa hai , kuch netaa log paisaa khaake is project ko band karne waale hai, Afsoos talojaa, kalyaan, Dombivali, bhivandi waalo ko metro nahi milegi,
@Akshay_Vartak
@Akshay_Vartak Ай бұрын
mumbai metros are being built to make more room for pupulation and increase congestion thats sad truth
@sanjaymarkam3149
@sanjaymarkam3149 Ай бұрын
metro line ke bajai flyover road banate to jyada fayda hota..
@shubh9158
@shubh9158 Ай бұрын
why houses, neighborhood and roads in mumbai are so ugly ??
@rollsroyce4249
@rollsroyce4249 Ай бұрын
Most of them are illegally built in the last few decades. As Mumbai is the financial capital of India many people moved there and made temporary, semi permanent structures by bribing politicians. Also City planning was not a big thing in India until the early 2000s.
@rksreepansh
@rksreepansh Ай бұрын
Work is too slow compared to other countries,we need to learn from them,how to work fast & with efficiency.❤
@susangomes9373
@susangomes9373 Ай бұрын
Why in Mumbai multi storey buildings have those ugly looking blue Tin Sheet above the roof??
@aniketjadhav6549
@aniketjadhav6549 Ай бұрын
Worst infrastructure. Too much gitchdi. No space for breath.
@jirachi-wishmaker9242
@jirachi-wishmaker9242 Ай бұрын
Okay
@saipavan5457
@saipavan5457 Ай бұрын
Sorry bro .. Your content is boring now ...
@jirachi-wishmaker9242
@jirachi-wishmaker9242 Ай бұрын
Yes Khatakhat, Redistribution & Reservation is more exciting
Why 14 Metro Lines in Mumbai will Reshape the Real Estate Market
14:30
Идеально повторил? Хотите вторую часть?
00:13
⚡️КАН АНДРЕЙ⚡️
Рет қаралды 17 МЛН
لااا! هذه البرتقالة مزعجة جدًا #قصير
00:15
One More Arabic
Рет қаралды 50 МЛН
How Used Luxury Cars Are "Ripping" INDIANs?
11:21
Biturbo Media
Рет қаралды 587 М.
Why India is Building Mumbai's Largest Airport
15:17
Lastly
Рет қаралды 535 М.
The Shocking Downfall of Big Bazaar
15:09
Shivanshu Agrawal
Рет қаралды 1,6 МЛН
Taloja-Kharghar Flyover Latest Update || Taloja-Kharghar Flyover Status ||
6:27
We Ranked "Worst to Best" Car Brands by their Engines in INDIA!
19:19
Biturbo Media
Рет қаралды 543 М.
Идеально повторил? Хотите вторую часть?
00:13
⚡️КАН АНДРЕЙ⚡️
Рет қаралды 17 МЛН