Drone video of the construction of the expressway Botevgrad - Mezdra - (I-1 E-79) - Lot 2 - from Lutidol to Mezdra
Length of the section: 13.3 km (from the 161st to the 174th km.)
Start: October 2019
Implementation period: 3 years (1096 days, of which 180 days for design).
Contractor: consortium "MB Lot 2 - 2019", composed of the companies:
- "European Roads" AD (80%);
- "Water Construction - Blagoevgrad" AD (19%);
- "Vakhostav - SC" (1%).
The road will be two-lane with two lanes of traffic in each direction, with a gauge of 20 m. The route will follow the existing road, passing by the villages of Lyuti dol, Tipchenitsa, Novachene and Skravena, it will pass along a new track.
Two tunnels, 490 m and 340 m long respectively, are being built on the Lüti bypass. A number of facilities will be built and repaired along the route - over the railway. p. the Mezdra - Sofia line, bridges over Iskar River, Malata Reka, Kalnitsa, Bebresh, Rudarka, as well as a road junction between the village of Novachene and Lyutidol.
According to the initial project, the intersections of the republican and municipal roads were to be carried out through roundabouts "Mezdra", "Darmantsi", "Rebarkovo", "Lyuti dol", "Skravena" and "Botevgrad", but at the moment the project is being revised and expected these roundabouts become two-level road junctions with direct directions coinciding with the new expressway.
The construction of agricultural overpasses, recreation areas, etc. is planned.
Video: Mezdra(Vidin)-Botevgrad road reconstruction - Lot-2
Date: 11.05.2024
Music by: Bensound.com/royalty-free-music
License code: 2XIRU95JHXDDI4RT
#mezdra #vraca #botevgrad #vidin #bulgaria #skypoint
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is violation of the licence under which this video is available on KZbin platform