she is the best i found and never looked for another one. but in 2022 October. i got ZERO questions on EV analysis, but you should know the basic fomulae like 4+3+1 she explained in another video. thanks Aileen for your service
@AileenEllisPMPPgMP Жыл бұрын
Great to hear!
@croudcircle9623 жыл бұрын
Hi Aileen, thank you for this wonderful video! I have a question though. At 7:00 you said that this sentence "You have spent $ 500 more than you planned to spend as of today" relates to schedule variance. And then, at 15:35, you said that this sentence "You have spent $ 500 more than you planned to spend as of today" relates to cost. I fail to understand the difference. Please advise.
@vc50742 жыл бұрын
One(7.00) is Schedule and other(15:35) is cost. At 7.00,it talks about schedule(not cost. May be the answer in C at 7.00) can be rephrased as " There is $500 worth of additional work that needs to be done as of today". If you replace t question with cost variance then the answer would be " The project is $500 over the budget " since it in negative.
@khalilrahman77314 жыл бұрын
Speechless, I thought I was ready for exam. This video really gave me a wake up call but I am glad that Aileen sent this link to all the subscribers for free. I will definitely recommend to all the PMP aspirants to make most of this 34 mins 25 seconds video. Aileen Ellis, thank you ever so much for this video. Kind regards, Khalil Rahman
@AileenEllisPMPPgMP4 жыл бұрын
So glad the video helped you. I believe that earned value management interpretation questions are actually harder for most people than the earned value math questions. Aileen
@mr.g86114 жыл бұрын
Wake up call for me too, but grateful to have found this. Aileen makes it so simple and easy to understand. I need to watch the video again and others also!
@eniolaodugbesan8664 жыл бұрын
Aileen Ellis it’s harder for me and I have to watch this video over and over again
@owlblanket3 жыл бұрын
thank you so much for this, Aileen. very helpful for my exam earlier. i just passed it today! :)
@nyaneece3 жыл бұрын
Congrats!
@anitak19774 жыл бұрын
Aileen, this video is by far one of the best PMP videos I have watched. I love the way you explain the material; simple and to the point. I found your last week webinar on Stakeholder & Communication Management very useful too. Well done and thank you again!
@desireejones62294 жыл бұрын
Amazing breakdown of the concepts to where I understood quickly and got the questions right!
@AileenEllisPMPPgMP4 жыл бұрын
So happy my video was able to help you. I know it sounds strange... but I love using earned value to help guide my decisions on projects.
@candicebessette25684 жыл бұрын
Thank you Aileen this is an excellent perspective on Earned Value Analysis and thinking simplistically for no math questions. Really reading the questions and asking yourself the questions; "what are we talking about here, schedule or cost?" etc. So thank you again.
@AileenEllisPMPPgMP4 жыл бұрын
Thank you. I think we make earned value all about math........and the math is just one small element of Earned Value.
@sarasalahi7491 Жыл бұрын
I think your videos are so motivating that helps me to keep moving forward without feeling overwhelmed. Thanks, Aileen.
@AileenEllisPMPPgMP Жыл бұрын
You are so welcome!
@tabithalarouse11482 жыл бұрын
Aileen... i stumbled into your videos just 2 days before my exam. I ran thru most of them and they really completed my preparation. Yesterday Feb 22nd 2022 I cleared my PMP exam! Thank u so much n may God bless u. All the best for everybody here who plan to take the Exam this year.... Regards, Tabitha - Indonesia 😇
@steves28283 жыл бұрын
Very helpful videos for me.....thank you for creating these videos!
@johnspiridis86242 жыл бұрын
Hi Aileen, thank you for this video. Can you tell me why you ask always at the beginnng ''is it about cost or schedule''. I am trying to understand from what perspective I should be looking at the questions. ''How much is spent or how much time ''?
@sunriseeternity3002 жыл бұрын
By far, the best video available on YT, on the topic.Thank you. #evm #capm #pmp #businessmath #enjoylife
@AileenEllisPMPPgMP Жыл бұрын
Wow, thank you!
@candicebessette25364 жыл бұрын
These questions could trip me up for sure. I am so glad to have this video helping us to breakdown what the questions are asking about cost or schedule and then explaining each answer helped me so. Thank you again.
@AileenEllisPMPPgMP4 жыл бұрын
I really expect that most of your earned value questions on this exam will include no math. We need to really understand earned value.... not memorize equations.
@hezekiahpedro65963 жыл бұрын
I dont mean to be so off topic but does any of you know of a way to get back into an instagram account?? I was stupid lost my login password. I would appreciate any tips you can offer me
@chrismeister74 Жыл бұрын
REALLY good explanations and practice questions!
@SolaAbiona2 жыл бұрын
Thanks so much for this video. It is very useful and insightful. Can you look at your answer at 10:20. I'm not sure how that is schedule and not cost. Again thanks for this good work. God bless you Aileen
@ronitheplusmodel4 жыл бұрын
This just changed my life!!!
@AileenEllisPMPPgMP4 жыл бұрын
Thank you for your kind comment. Comments like yours change my life. If you would like invites to free online PMP training, sign up for my email list at: www.aileenellis.com/
@aLy0op4 жыл бұрын
This is extremely helpful. Really appreciate you taking the time to make it. Great way to understand everything before adding in the equations too (in my opinion)
@AileenEllisPMPPgMP4 жыл бұрын
Glad it was helpful! Thank you. Go to www.aileenellis.com/ and sign up to our email list for free training.
@lavonnadavis71803 жыл бұрын
I really enjoy your videos and your ability to explain these concepts logically.
@PMPwithRay4 жыл бұрын
Very simplistic way of explaining the concepts. Thanks for the video Aileen.
@AileenEllisPMPPgMP4 жыл бұрын
You're very welcome!
@nyaneece3 жыл бұрын
Thanks so much for this video! This is the best breakdown I've reviewed thus far
@sheikabdulkaleem64873 жыл бұрын
Aileen, You are one of the best trainers. EVM simplified, Now I'm confident to tackle EVM Questions.
@AileenEllisPMPPgMP3 жыл бұрын
Thank you so much. Have you tried our app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@jorgesantos66933 жыл бұрын
Thanks for sharing all your knowledge about project manager. God bless you. from Angola-Luanda
@AileenEllisPMPPgMP3 жыл бұрын
My pleasure
@chihebensalem2 жыл бұрын
i can't explain how much I like this video. I always repeat it to refresh memory
@AileenEllisPMPPgMP2 жыл бұрын
Thank you for your kind comments. I provide free training once per week for PMP. You can sign up for my email list here: www.aileenellis.com/ Also, would you like to connect on LinkedIn as well? linkedin.com/in/projectmanagementexpertaileen
@karenjolly9584 жыл бұрын
Fantastic breakdown of concepts. Thanks Aileen, bought your books to practice on my upcoming PMP.
@AileenEllisPMPPgMP4 жыл бұрын
Glad it was helpful! Sign up for free live training at: www.aileenellis.com/
@soni308804 жыл бұрын
Great video. Covering COST Mgmt concepts which is not covered in any PMP books. You have explained it in such a way that it made it easier to remember for the Exams.
@AileenEllisPMPPgMP4 жыл бұрын
Glad you liked the video. Are you attending my free weekly live PMP training sessions? If not, you can sign up here for invites.www.aileenellis.com/pmp-exam-online-self-study-program-with-aileen
@zeeshanbaloch26003 жыл бұрын
I love listening to Aileen. I like the sound of her voice, like my Mother talking to me. I learn quickly with her.
@AileenEllisPMPPgMP3 жыл бұрын
You are very welcome. Have you tried our new app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@fabionielsen28762 жыл бұрын
Aileen , Thank you so much for the video. it is really helpful¹
@AileenEllisPMPPgMP2 жыл бұрын
Glad it was helpful! I provide free training once per week for PMP. You can sign up for my email list here: www.aileenellis.com/ Also, would you like to connect on LinkedIn as well? linkedin.com/in/projectmanagementexpertaileen
@rheroberts8683 ай бұрын
This was so good.😊
@robbinsdk3 жыл бұрын
I really like how you break down the questions on whether the ask is about cost or schedule and to keep it simple, is it good or bad and to look for key words to determine ETC and the TCPI ( >1 is harder to achieve and
@jghhawk4 жыл бұрын
Awesome
@AileenEllisPMPPgMP4 жыл бұрын
James- glad you liked this video. May I assume you are preparing for the PMP Exam? Send me an email at aileen@amegroupinc.com for access to more videos.
@andraousjahshan50142 жыл бұрын
Excellent explanation- thank you very much
@AileenEllisPMPPgMP2 жыл бұрын
Glad it was helpful! You are very welcome. I provide free training once per week for PMP. You can sign up for my email list here: www.aileenellis.com/ Also, would you like to connect on LinkedIn as well? linkedin.com/in/projectmanagementexpertaileen
@melissahaynie51463 жыл бұрын
Thank you for sharing this information. You recommended standing up and stretching during the 10 minute break. What are the rules about having a snack during the break, such as a granola bar? Thank you, Melissa
@AileenEllisPMPPgMP3 жыл бұрын
Yes you can have a snack. You can leave the room. Have you tried our new app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@melissahaynie51463 жыл бұрын
@@AileenEllisPMPPgMP Wow, that's so great you have an app - I wish I knew about that earlier. Fortunately, I passed my exam. Thank you for your helpful videos :o).
@ashwagalmayof26754 жыл бұрын
Thank you very much .. this is a very valuable and helpful..
@AileenEllisPMPPgMP4 жыл бұрын
Glad to hear that! Have you considered our PMP Exam Self Study Program: www.aileenellis.com/pmp-exam-online-self-study-program-with-aileen
@AncestorsWatchingEthiopiaIsCal3 жыл бұрын
❤❤❤❤❤❤
@AileenEllisPMPPgMP3 жыл бұрын
Thank you. You are very welcome. Have you tried our new app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@otenefreeman51403 жыл бұрын
Great job,,ma,m
@michaelshilesky27674 жыл бұрын
This was very helpful and made sense to me. Thank you Aileen!
@AileenEllisPMPPgMP4 жыл бұрын
You're so welcome! Thank you. Go to www.aileenellis.com/ and sign up to our email list for free training.
@khaleefathullahrahil33792 жыл бұрын
Brilliant!!!
@camerowmetcair84583 жыл бұрын
Thank you for this instruction keeping it simple and not complicated. it can be daunting in the beginning all the maths and % etc. Added to my notes for memory and mock exams Ill following your channel now
@jjafri7862 жыл бұрын
You are an amazing teacher!! I read so much on this topic to no avail. I watched your video and I feel so confident on this topic. God bless you!!! Many thanks!!!
@ongcarol82473 жыл бұрын
Thanks Aileen, this is very helpful!
@AileenEllisPMPPgMP3 жыл бұрын
You are very welcome. Have you tried our new app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@richiecarter42314 жыл бұрын
Thanks for this video! It has explained EVA so much clearer!
@Gadyal3 жыл бұрын
Thanks for the clear explanation.
@AileenEllisPMPPgMP3 жыл бұрын
You are welcome!
@nicholaswilliams9474 жыл бұрын
I was able to create some more flash cards that will help quickly interpret earned value questions without trying to do a whole bunch of mathematical calculation. Fantastic video!
@innqubus3 жыл бұрын
thankyou so much. This nailed my Cost related concepts to perfection!
@roxanneanderson8703 жыл бұрын
This is a great video. Thank you so much for sharing. It was very helpful. smile
@crimemastertoto4 жыл бұрын
Thank you ma'am, great explanation
@AileenEllisPMPPgMP4 жыл бұрын
Keep watching. Thank you. Go to www.aileenellis.com/ and sign up to our email list for free training.
@candicebessette25364 жыл бұрын
Thankful for your time in covering this!
@AileenEllisPMPPgMP4 жыл бұрын
Glad the video helped you. I think this is an important idea for the exam. Aileen
@satyabratapaul7740 Жыл бұрын
Thanks Aileen. This is one of the best tutorials on Earned Value.
@izuzeal60264 жыл бұрын
really learnt a lot from this video.Thanks for sharing!
@CoachVickiW3 жыл бұрын
Thank you SOOOOO very much for being understandable in the way you present things with words I understand. Great Job!!!!!!
@AileenEllisPMPPgMP3 жыл бұрын
You are so welcome! Have you considered my Online Program to help people pass the PMP Exam? www.aileenellis.com/pmp-exam-online-self-study-program-with-aileen
@icecold4ever14 жыл бұрын
good video , however: i want to know which of the EAC equations to use in PMP exam, my exam is next thursday. I get confused on which one to use : 1- EAC = BAC/CPI 2- EAC = AC + (BAC-EV) 3- EAC = AC + ((BAC - EV /SPI*CPI)) Need help to understand which one to use , in another words how to interpret the question? Pls help
@erinwu11093 жыл бұрын
My understanding is you use the formulas based on the respective conditions 1. If the CPI remained the same thru the rest of the project 2. If CPI will change or is expected to continue at the budgeted rate 3. If both CPI and SPI are unchanged Hope you got thru! My exam is tomorrow! :)
@jacktrader19733 жыл бұрын
I really like your videos but it’s confusing when You say “as of today” in your definition for CV and CPI but when it comes to MCQ questions you say that today refers to schedule.
@ashibhargava3 жыл бұрын
The key word is "planned" and "spend". But yes that question is confusing 500$ spent in CV
@bollygirlNYC2 жыл бұрын
THANK YOU, AILEEN!!!
@AileenEllisPMPPgMP2 жыл бұрын
You are very welcome. I provide free training once per week for PMP. You can sign up for my email list here: www.aileenellis.com/ Also, would you like to connect on LinkedIn as well? linkedin.com/in/projectmanagementexpertaileen
@SB-zv7ro4 жыл бұрын
Taking the PMP tomorrow. Came on KZbin for some last minute tips and tricks and came across this video. Wish I had been watching Aileen the whole time! Great video. Will be back if I don't pass LOL
@AileenEllisPMPPgMP4 жыл бұрын
Good luck. I have lots of videos that can help you. Hope you pass. If you don't, email me at aileen@amegroupinc.com
@fyyzzaa4 жыл бұрын
Very well explained. 👏
@AileenEllisPMPPgMP4 жыл бұрын
Glad you liked it. Thank you. Go to www.aileenellis.com/ and sign up to our email list for free training.
@ctaa033 жыл бұрын
Aileen, thank you so very very much for making these videos. I passed my CAPM exam today - above target in all areas! This video and memorizing the outputs and TTs were most helpful for me. Thank you so very much again.
@AileenEllisPMPPgMP3 жыл бұрын
Congratulations. You are very welcome.
@femiakintan88294 жыл бұрын
With just 2 days to my PMP exam, I find this video extremely helpful. You made EVM a lot easier to understand. Thank you so much Aileen.
@AileenEllisPMPPgMP4 жыл бұрын
How did your exam go?
@yongeugenegwain75584 жыл бұрын
cost The cost variance (cv) is $500 what does this mean A the project is ahead of schedule B the project is $500 over budget C the project is $500 under Budget D the project is behind schedule
@heybruh32744 жыл бұрын
Dealing with COST so answers "A" and "D" can be eliminated quickly since they deal with schedule. So, a CV> $0 means you are under budget. The correct answer is "C".
@mortalandow50983 жыл бұрын
This is really great
@AileenEllisPMPPgMP3 жыл бұрын
You are welcome. Have you tried our new app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@T_star11113 жыл бұрын
Thank you for the amazing explanation. This is the best EVM I have came across so far.
@AileenEllisPMPPgMP3 жыл бұрын
Thank you. You are very welcome. Have you tried our new app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@kamelgameel12504 жыл бұрын
Thanks a lot Aileen
@AileenEllisPMPPgMP4 жыл бұрын
You are very welcome.
@angeliaday86423 жыл бұрын
Wonderful explanations!
@nebrasradaideh34563 жыл бұрын
Amazing Vid !! Thanks Aileen
@ambroliya4 жыл бұрын
Thank you so much for this video, Absolutely made all this look so simple.
@AileenEllisPMPPgMP4 жыл бұрын
You are so welcome! Have you considered our PMP Exam Self Study Program: www.aileenellis.com/pmp-exam-online-self-study-program-with-aileen
@joanepetion68594 жыл бұрын
Thank you so much, I finally understand those concepts. This video was well detailled
@AileenEllisPMPPgMP4 жыл бұрын
Glad it was helpful! Sign up for free training with me at: www.aileenellis.com/
@carbuet3 жыл бұрын
Isn't the option d. of question at 7:00 cost related (though it is wrong) instead of schedule?
@sachinm203 жыл бұрын
Yes, it definitely seems that way. The moment 'spent' is mentioned Cost comes in play right away!
@successstoreytrading3 жыл бұрын
wow... you are really good @aileen
@khadijaaammou29364 жыл бұрын
You are the best. Thanks lot
@lindawee-henz95413 жыл бұрын
Thank you for the clear explanations. This is really helpful.
@AileenEllisPMPPgMP3 жыл бұрын
You're very welcome! You are very welcome. Have you tried our new app? apps.apple.com/us/app/pmp-exam-prep-with-aileen/id1570349699
@Big_Mo_Zak3 жыл бұрын
Excellent approach 👍
@eniolaodugbesan8664 жыл бұрын
Honestly, your videos are amazing. Well explained
@AileenEllisPMPPgMP4 жыл бұрын
Glad you think so! Have you registered for our free online training?www.aileenellis.com/
@prashantkulkarni92444 жыл бұрын
Very helpful, Aileen. Thank you for posting this!
@AileenEllisPMPPgMP4 жыл бұрын
Glad it was helpful! Sign up for free training with me at: www.aileenellis.com/
@chrystalflippo81444 жыл бұрын
THIS WAS JUST COMPLETELY AWESOME, CLEAN AND STRAIGHT FORWARD
@AileenEllisPMPPgMP4 жыл бұрын
Glad this helped you. When are you testing? How is your studying going?
@kareemhclyburnva4 жыл бұрын
I wish I had found this video 3 months ago! I test in 2 days but this was great!
@AileenEllisPMPPgMP4 жыл бұрын
Thank you. Make sure you watch my video on outputs and my other video on the 49 proceses.
@VamsiKrishna-ls5fk4 жыл бұрын
awesome video ...Easy to understand the concepts.
@AileenEllisPMPPgMP4 жыл бұрын
Glad you liked it Glad it was helpful! Sign up for free training with me at: www.aileenellis.com/
@shommytv4 жыл бұрын
Passed this morning and your videos were so helpful. Thank you!
@AileenEllisPMPPgMP4 жыл бұрын
You are so welcome! Congratulations. If you have two minutes could you write a quick testimonial? It would be greatly appreciated. It truly will take less than two minutes. www.aileenellis.com/pmp-exam-aileen-review-on-trustpilot
@shommytv4 жыл бұрын
@@AileenEllisPMPPgMP I just submitted the testimonial. Thanks again
@silvavadney22674 жыл бұрын
Thank you for the explanation...
@AileenEllisPMPPgMP4 жыл бұрын
You are welcome!
@metricascfp40084 жыл бұрын
Very clear!
@AileenEllisPMPPgMP4 жыл бұрын
Glad it was helpful! When are you testing? How is your studying going?