Thanks for covering that topic, specially with the detail description of screen and earth conductor logic, it helps during practical applications.
@rana_amir_ali2 жыл бұрын
Great information.
@manhamiraalvlogs7862 жыл бұрын
V informative...
@Huzaifa93942 жыл бұрын
Both topic are very well explain
@Knowledge1bySahil2 жыл бұрын
Both topics are very well explained and graphical animations are getting close to perfection. Highly appreciate your time and knowledge sharing.
@electricalmatters23202 жыл бұрын
Thanks
@muhammadshoaibaslam99112 жыл бұрын
Very important topic with industrial point of view. Well explained. Sir, keep up the good work 👍
@electricalmatters23202 жыл бұрын
Thank you
@sarmadelahi53602 жыл бұрын
Greatly explained Sir. Common fault in Medium voltage pannels as mostly electrians forget to circulate earthing cable from CT.
@muhammadyousafyousaf76352 жыл бұрын
Great Vidio
@muhammadyousafyousaf76352 жыл бұрын
Very Very Nice
@waseemzafar57182 жыл бұрын
Nice explaination with added graphics
@electricalmatters23202 жыл бұрын
Thanks Dear
@nasrullahnawaz4352 жыл бұрын
Nicely explained sir g.
@electricalmatters23202 жыл бұрын
Thank you so much Sir. Your words are always valuable for me.
@junaidkhalid13372 жыл бұрын
Very well explained 👍
@electricalmatters23202 жыл бұрын
Thanks
@Knowledge1bySahil2 жыл бұрын
CBCT Method: Do we have to pass earthing cable of screen through Toroid ? In order to produce emf in case of red phase to cable screen ground fault ? 03 CT method : Does the relay measure and compare magnitude of all CT’s secondary current ? Please reply
@electricalmatters23202 жыл бұрын
Need to pass one time again from toroid. So as to cancel out effect of initial neutralization
@electricalengineer77542 жыл бұрын
Excellent Explanation Sir. Sir i have one question: Three CT Method is explained for connecting three CTs in Parallel for Protection Purpose in three phase system and we achieve normal balance condition , now what happens to the balancing condition when we use TWO CTs for Metering purpose in three phase system instead of Three CTs.