Winslow station and Little Horwood Road Bridge update - May 2022
Пікірлер: 29
@thomaswykes3647 Жыл бұрын
Nice to see many of the original bridges being retained. Gives this railway character and softens the visual impact
@Sam_Green____41142 жыл бұрын
l used to drive under that bridge @ 02:15 regularly driving from Bicester to Cambridge via Calvert, Winslow ,Milton Keynes and Bedford many many years ago !! Coming out on the Buckingham - Milton Keynes road . l always thought it was the old Great Central !! Amazing to think trains will cross it again !! l never thought l would see trains on it again !! ( well l might not now as l have been living in Greece the last six years with no plans to return !! ).
@Stipperstone2 жыл бұрын
A map of the route would have been helpful.
@joginns7782 жыл бұрын
How far of is the tracklaying. From Winslow I read somewhere it wasn't swanbourne five miles from bletchley if true there not hanging about ialso read Grant shapp has given two point seven billion pounds to start the Bedford to Cambridge,
@johnodell53102 жыл бұрын
I read on EastWest rail's site tracklaying will be in 2023.
@joginns7782 жыл бұрын
@@johnodell5310 I've watched the video on here and it shows the track over the bletchley flyover heading towards swanbourne it's a disgrace that the bletchley to ayelsbury won't go ahead as all the track has been lifted to make way for hs 2 from Calvert to finmere and beyond following the old great Central route,
@ianhosier40422 жыл бұрын
@@joginns778 they can probably solve that deficiency by running a shuttle bus service between Aylesbury vale parkway and Winslow.
@joginns7782 жыл бұрын
@@ianhosier4042 it makes you wander if hs 2had anything to do with the lack of funding for bletchley to Aylesbury,it seems a bit strange hs 2 have the track bed Calvert to finmere,with no room to put in a single track for ewr to connect the two town's,
@ianhosier40422 жыл бұрын
@@joginns778 sad how the evil elites won't fund a useful commuter route yet are happy to pay for a railway that will only be used by the rich few. I hate this wicked world and can't wait for it to end and all those evil people to go where they belong.
@ianhosier40422 жыл бұрын
Nice to see new platforms but surprised no tracks as surely bringing materials in by train is better than cluttering the roads up with trucks?
@chriswoodfield2 жыл бұрын
I agree - you should see the state of the roads around here!
@andrewreynolds49492 жыл бұрын
They need to build the track bed before they can lay the track, and it’s easier and cheaper to do all your earthworks and stuff at the same time rather than having to come back and finish it later
@JohnLavender2 жыл бұрын
@@chriswoodfield Good update. Looking forward to the next ones, possibly with Engineering Trains working. We are fortunate that the track on the #NorthumberlandLine is already in situ and has mostly been relaid to Passenger Trains Standard. Station work is Commencing, and Reopening to Ashington is slated for winter 2023/24.
@louisc.gasper75882 жыл бұрын
@@andrewreynolds4949 I should think it also is affected by how far the materials and machinery have to travel to get there.
@None-zc5vg2 жыл бұрын
I used the original line to get from Bletchley to Oxford in 1966: the two-coach d.m.u.'s didn't see many passengers.
@kmcat2 жыл бұрын
Will this line be electrified? Is it build to the larger loading gauge?
@chriswoodfield2 жыл бұрын
Way back, the plan was to electrify the line, but that was “moved to a later phase”; which probably means it will never happen!
@kmcat2 жыл бұрын
@@chriswoodfield did it except anything less, next thing you will tell me it's built to a standard UK gauge and not the more useful and larger European gauge - this would have been the perfect project to experiment with it
@scottpeacock5492 Жыл бұрын
Why add more electricfaction, when hydroflex is the future, porterbrook University of Cambridge has just turn an old electric class 319 into hydroflex that runs on new renewable engery, A Rail company have just started to roll them out in part of the rail network kzbin.info/www/bejne/nZakha1qpcl2ick
@chairmakerPete2 жыл бұрын
Good to see the steady progress, but I swear this station design fell out of the ugly tree and hit every branch on the way down. It's revolting. However, disgusting "architecture" aside, better a hideous railway than no railway 👍
@francisrogers98242 жыл бұрын
I can see these boxes with blue coverings about half way through the video. Are those foundations for future electrification?
@joginns7782 жыл бұрын
Ithink the boxes are drainage as that trackbed trends to flood,
@thetessellater91632 жыл бұрын
I see lots of steps but no wheelchair accessible ramps built yet ? Are disable people excluded here ?
@Northstander2 жыл бұрын
There is what looks like a footing for a lift on both platforms. I am guessing that there will be an overbridge across the railway with step-free access, via a lift, to the platforms...which must be pretty standard for a station that is located at the bottom of a cutting.